should be pumped 20 minutes more. If the
pressure can’t achieve -0.1Mpa(14.5Psi) after
pumping 50 minutes, please check if there are
some leakage points. Fully close the handle Lo
valve of the manifold valve and stop the operation
of the vacuum pump. Confirm that the gauge
needle does not move (approximately 5 minutes
after turning off the vacuum pump).
7)Turn the flare nut of the 3-way valves about 45°
counterclockwise for 6 or 7seconds after the gas
coming out, then tighten the flare nut again. Make
sure the pressure display in the pressure
indicator is a little higher than the atmosphere
pressure. Then remove the charge hose from the
3 way valve.
8) Fully open the 2 way valve and 3 way valve
and securely tighten the cap of the 3 way valve.
6.7 Re-installation while the outdoor unit
need to be repaired
1. Evacuation for
the whole system
Procedure:
1).
Confirm that both the 2-way and 3-way
valves are set to the opened position.
2). Connect the vacuum pump to 3-way valve’s
service port.
3). Evacuation for approximately one hour.
Confirm that the compound meter indicates
-0.1Mpa(14.5Psi).
4). Close the valve (Low side) on the charge set,
turn off the vacuum pump, and confirm that the
gauge needle does not move (approximately 5
minutes after turning off the vacuum pump).
5). Disconnect the charge hose from the vacuum
pump.
2. Refrigerant charging
Procedure:
1). Connect the charge hose to the charging
cylinder, open the 2-way valve and the 3-way
valve
Connect
the
charge
hose
which
you
disconnected from the vacuum pump to the
valve at the bottom of the cylinder. If the
refrigerant is R410A, make the cylinder bottom
up to ensure liquid charge.
2). Purge the air from the charge hose
Open the valve at the bottom of the cylinder
and press the check valve on the charge set to
purge the air (be careful of the liquid
refrigerant).
3) Put the charging cylinder onto the electronic
scale and record the weight.
4). Open the valves (Low side) on the charge set
and charge the system with liquid refrigerant
If the system cannot be charge with the specified
amount of refrigerant, or can be charged with a
little at a time (approximately 150g each time) ,
operating the air conditioner in the cooling cycle;
however, one time is not sufficient, wait
approximately 1 minute and then repeat the
procedure.
5).When the electronic scale displays the proper
weight, disconnect the charge hose from the
3-way valve’s service port immediately
If the system has been charged with liquid
refrigerant while operating the air conditioner,
turn off the air conditioner before disconnecting
the hose.
6). Mounted the valve stem caps and the service
port.
Use torque wrench to tighten the service port
cap to a torque of 18N.m.
Be sure to check for gas leakage.
Содержание MCHS-09PSH1
Страница 1: ...Mission 3D Inverter Series Service Manual 2016 MBSUL A 1604...
Страница 8: ...For 9k 12k For 18k 24k For 30k 36k...
Страница 11: ...5 Wiring Diagram 5 1 Indoor Unit MEHS 09PSH1 MEHS 12PSH1 MEHSU 09PHH2 MEHSU 12PHH2...
Страница 12: ...MEHSU 18PHH2 MEHSU 24PHH2 MEHS 30PSH2 MEHS 36PSH2...
Страница 13: ...5 2 Outdoor Unit MCHS 09PSH1 MCHS 12PSH1 MCHSU 09PHH2 MCHSU 12PHH2 MCHSU 18PHH2...
Страница 14: ...MCHSU 24PHH2 MCHS 30PSH2 MCHS 36PSH2...
Страница 45: ...P W N U...
Страница 46: ...N V N W...
Страница 78: ...compressor on bottom plate 4 Lift the compressor from the base pan assembly 3...