background image

 6

INSTALLATION   INSTRUCTIONS

1. For  the  left-hand  and  right-hand  piping, remove the pipe cover from the side panel.
    Explain to clients that the pipe cover must be kept as it may be used when relocate the 
    air conditioner to any other place.
2. For the rear-right-hand and rear-left-hand piping, install the piping as shown. Bend the
    connective  pipe to  be  laid at  43mm  height or  less from the wall.
3. Fix the end of the connective pipe. (Refer to Tightening Connection in REFRIGERANT 
    PIPING CONNECTION)

Connective pipe

Indoor unit outline

Connective pipe

.

.

.

.

.

.

.

. .

.

.

.

.

.

.

.

. .

.

.

. .

.

.

. .

.

.

.

.

.

.

. .

.

. .

.

.

.

.

.

.

.

.

. .

.

.

. .

.

.

.

.

.

. .

.

. . .

.

.

.

.

.

.

. .

.

.

.

.

.

.

. .

.

.

.. .

.

.

.

.

. .

.

.

.

.

.

. .

.

.

.

.

..

.

..

.

. .

.

.

.

.

.

. .

.

.

.

.

.

. .

.

.

.

.

.

.

.

.

.

.

. ..

.

.

.

.

.

.

.

.....

.

..

.

.

.

...

4

3

1. Pass the piping through the hole in the wall.

2. Put the upper claw at  the back of the indoor unit on

    the upper  hook of  the  installation  plate, move  the

    indoor unit from side to side to see that it is securely

    hooked.

3. Piping can  easily be made  by lifting  the indoor unit

    with  a cushioning material  between the  indoor unit

    and the wall. Get it out after finish piping.

4. Push the lower part of the indoor unit up on the wall,

    Then move the indoor unit from side to side, up and

    down to check if it is hooked securely.

Fig.10

4. Indoor unit installation

Fig.8

Fig.9

3. Connective Pipe and Drainage Installation

1. Run the drain hose sloping downward. Do not  install  the  drain  hose as  illustrated below.

2. When  connecting  extension  drain  hose, insulate the  connecting part of  extension
    drain hose with a shield pipe, do not let the drain hose slack.

Drainage

Fig.7

Do not block water flow by a rise.

Do not put the end of 
drain hose into water.

Upper hook

Lower hook

Cushioning material

Right-hand piping

Slid Part cover

Left-hand piping

Rear-right piping

Rear-left piping

Содержание Elite Plus MSE18HRN1

Страница 1: ...please read this manual carefully and keep it for future reference ROOM AIR CONDITIONER Before using your air conditioner please read this manual carefully and keep it for future reference ROOM AIR CO...

Страница 2: ...authorised installer for installation of this unit The air conditioner is not intended for use by young children or infirmed persons without supervision Young children should be supervised to ensure t...

Страница 3: ...nd this installation instructions An independent circuit and single outlet must be used If electrical circuit capacity is not enough or defect found in electrical work it will cause electrical shock f...

Страница 4: ...e connection side right side should have more than 60cm of clearance Do not place animals and plants in the path of the air inlet or outlet Take the air conditioner weight into account and select a pl...

Страница 5: ...should be free from obstructions CAUTION 1 2 3 4 5 6 7 Parts you must purchase The minimum pipe wall thickness of 0 7mm is required 6 35 9 53 12 7 8 2 Self tapping Screw B ST2 9X10 Remote controller I...

Страница 6: ...ponding mounting points on the installation plate Dimensions are in mm unless otherwise stated 1 Determine hole positions according to the diagram detailed in Fig 5 Drill one 1 hole 65mm slanting slig...

Страница 7: ...oor unit from side to side to see that it is securely hooked 3 Piping can easily be made by lifting the indoor unit with a cushioning material between the indoor unit and the wall Get it out after fin...

Страница 8: ...n hose sloped downward to drain out the cond ensed water smoothly CAUTION Install the outdoor unit on a rigid base to prevent increasing noise level and vibration Determine the air outlet direction wh...

Страница 9: ...90 C Roughness Burr Main cause for refrigerant leakage is due to defect in the flaring work Carry out correct flaring work using the following procedure A Cut the pipes and the cable 1 Use the piping...

Страница 10: ...8 1 0 9 53 2940 300kgf cm 3430 350kgf cm Fig 19 Indoor unit tubing Flare nut Pipings Fig 18 Electric safety regulations for the initial Installation 1 If there is serious safety problem about the pow...

Страница 11: ...ft the indoor unit panel up remove the electrical box cover by loosening the screw 4 Ensure the colour of wires of outdoor unit and the terminal Nos are the same to the indoor s respectively 5 Wrap th...

Страница 12: ...onnection from a power supply shall be incorporated in the fixed wiring and have an air gap contact separation of at least 3mm in each active phase conductors CAUTION CAUTION CAUTION CAUTION Air and m...

Страница 13: ...Lo of the manifold valve 4 Operate the vacuum pump to evacuate After starting evacuation slightly loose the flare nut of the Lo valve on the gas pipe side and check that the air is entering Operation...

Страница 14: ...t connection or outdoor unit connections by a soft brush to check for leakage of the connecting points of th piping If bubbles come out the pipes have leakage 2 Leak detector Use the leak detector to...

Страница 15: ...CS406 I1 2200018041...

Отзывы: