background image

Perform the electric safe check after completing installation:
1. Insulated resistance
    The insulated resistance must be more than 2M

.

2. Grounding work 
    After finishing grounding work, measure the grounding resistance by visual detection and 
    grounding resistance tester. Make sure the grounding resistance is less than 4

3. Electrical leakage check (performing during test running)
    During test operation after finishing installation, the serviceman can use the electroprobe 
    and multimeter to perform the electrical leakage check. Turn off the unit immediately if 
    leakage happens. Check and find out the solution ways till the unit operate properly.

A: Lo packed valve  B: Hi packed valve 
C and D are ends of indoor unit connection.

CAUTION

Indoor unit
check point

D

B

C

A

Outdoor unit
check point

Cover

Fig.25

 

  Electrical safety check

 

  Gas leak check

1. Soap water method:
     Apply a soap water or a liquid neutral detergent 
     on the indoor unit connection or outdoor unit 
     connections by a soft brush to check for leakage 
     of the connecting points of th piping. If bubbles
     come out, the pipes have leakage.
2. Leak detector

Use the leak detector to check for leakage.

Test running

Safety and leakage check

13

 TEST RUNNING

1. Check that all tubing and wiring have been properly connected.
2. Check that the gas and liquid side service valves are fully open.

    Perform test running after completing gas leak and electrical safety check.
    The test running time should last more than 30 minutes.

1. Hold the panel sides and push it upward, then  lift the panel up to an angle which 
    remains fixed. Do not lift the panel any further when it stops with a  click sound.
2. Press the manual control button twice until the operating indicator lights up, the unit
    will operate on Forced Cool mode.
3. Check if all the functions works well during test running. Especially check whether
    the drainage of indoor unit is smooth or not.
4. Press the manual switch button again after finishing the test running. The operating
    indicator turns dark and the unit stops operating.

Manual control 

Button

AUTO/COOL

Содержание Elite Plus MSE18HRN1

Страница 1: ...please read this manual carefully and keep it for future reference ROOM AIR CONDITIONER Before using your air conditioner please read this manual carefully and keep it for future reference ROOM AIR CO...

Страница 2: ...authorised installer for installation of this unit The air conditioner is not intended for use by young children or infirmed persons without supervision Young children should be supervised to ensure t...

Страница 3: ...nd this installation instructions An independent circuit and single outlet must be used If electrical circuit capacity is not enough or defect found in electrical work it will cause electrical shock f...

Страница 4: ...e connection side right side should have more than 60cm of clearance Do not place animals and plants in the path of the air inlet or outlet Take the air conditioner weight into account and select a pl...

Страница 5: ...should be free from obstructions CAUTION 1 2 3 4 5 6 7 Parts you must purchase The minimum pipe wall thickness of 0 7mm is required 6 35 9 53 12 7 8 2 Self tapping Screw B ST2 9X10 Remote controller I...

Страница 6: ...ponding mounting points on the installation plate Dimensions are in mm unless otherwise stated 1 Determine hole positions according to the diagram detailed in Fig 5 Drill one 1 hole 65mm slanting slig...

Страница 7: ...oor unit from side to side to see that it is securely hooked 3 Piping can easily be made by lifting the indoor unit with a cushioning material between the indoor unit and the wall Get it out after fin...

Страница 8: ...n hose sloped downward to drain out the cond ensed water smoothly CAUTION Install the outdoor unit on a rigid base to prevent increasing noise level and vibration Determine the air outlet direction wh...

Страница 9: ...90 C Roughness Burr Main cause for refrigerant leakage is due to defect in the flaring work Carry out correct flaring work using the following procedure A Cut the pipes and the cable 1 Use the piping...

Страница 10: ...8 1 0 9 53 2940 300kgf cm 3430 350kgf cm Fig 19 Indoor unit tubing Flare nut Pipings Fig 18 Electric safety regulations for the initial Installation 1 If there is serious safety problem about the pow...

Страница 11: ...ft the indoor unit panel up remove the electrical box cover by loosening the screw 4 Ensure the colour of wires of outdoor unit and the terminal Nos are the same to the indoor s respectively 5 Wrap th...

Страница 12: ...onnection from a power supply shall be incorporated in the fixed wiring and have an air gap contact separation of at least 3mm in each active phase conductors CAUTION CAUTION CAUTION CAUTION Air and m...

Страница 13: ...Lo of the manifold valve 4 Operate the vacuum pump to evacuate After starting evacuation slightly loose the flare nut of the Lo valve on the gas pipe side and check that the air is entering Operation...

Страница 14: ...t connection or outdoor unit connections by a soft brush to check for leakage of the connecting points of th piping If bubbles come out the pipes have leakage 2 Leak detector Use the leak detector to...

Страница 15: ...CS406 I1 2200018041...

Отзывы: