
2019
4.4
Tabl
S
F
902
Wiring
Step
le
3
‐
4.2:
Wiring
Step
1
Check
th
should
b
electric
2
The
con
3
Wiring
c
4
The
mai
5
The
wire
6
Wires
sh
7
Phase
se
8
The
mai
improve
9
MC
‐
SU3
contacto
Fig.3
‐
4.2
10
MC
‐
SU9
pipeline
of
the
u
11
MC
‐
SU3
must
pa
12
MC
‐
SU9
termina
13
Connect
control
igure
3
‐
4.2:
wir
ps
g
steps
he
unit
and
ens
be
mounted
in
shock.
ntrol
box
of
the
connection
hole
in
power
and
n
es
of
the
main
hould
be
conne
equences
must
in
power
shoul
e
safety.
30(M)
‐
RN1L
and
or
of
the
auxilia
2
90
‐
RN1L
connec
e
auxiliary
elect
unit.
as
shown
in
30(M)
‐
RN1L
and
ass
the
connect
90
‐
RN1L
Conne
als
PUMP
and
N
tion
of
the
wire
box
as
standard
re
connection
of
sure
that
it
is
co
strict
accordan
main
power
sw
es
of
the
main
eutral
wires
an
power
must
pa
ected
firmly
to
t
t
be
consistent
d
be
located
ou
d
MC
‐
SU60(M)
‐
ary
electric
hea
ction
of
contro
tric
heater
must
n
Fig.
3
‐
4.3
d
MC
‐
SU60(M)
‐
tion
terminals
C
ction
of
contro
N
of
the
connect
ed
controller
to
d.
of
auxiliary
elect
P
o
w
e
r
su
p
p
ly
(
2
2
0
-2
4
0
V
~
5
0
H
z)
L1/L2/L3
N
onnected
with
g
nce
with
the
req
witch
must
be
m
power
should
b
nd
grounding
w
ass
the
bonding
the
connection
when
the
wires
ut
of
easy
reach
‐
RN1L
connecti
ater
must
pass
t
l
wires
of
pipeli
t
pass
the
conn
‐
RN1L
Connect
CN1
or
CN2
of
t
l
wires
of
pump
tor
XT1
in
the
e
P,
Q,
E
termina
tric
heaters
for
CN19
_L
p
p
y
(
)
CN19
_N
Conten
grounding
wire
quirements
of
e
mounted
in
a
p
be
provided
wit
wires
of
power
s
g
clamp.
n
terminals
A,B,
s
of
the
main
p
h
of
non
‐
profes
ion
of
control
w
the
connection
ine
auxiliary
ele
nection
termina
ion
of
control
w
the
main
unit,
a
p:
the
control
w
electric
box
of
t
al
in
the
electric
MC
‐
SU30(M)
‐
R
Contro
Overcurr
nt
es
correctly,
to
a
electrical
engin
roper
position.
th
glue
cushion
upply
are
led
in
C,
N.
ower.
ssional
mainten
wires
of
auxiliar
terminals
CN1
ectric
heaters:
t
als
HEAT1
and
C
wires
of
pump:
as
shown
in
Fig.
wires
of
AC
cont
the
unit,
as
show
c
control
box.
T
RN1L
and
MC
‐
S
l coil of 3 phaseA
rent relay
A
avoid
leakage,
a
eering
rules.
Th
.
nto
the
electric
ance
personne
y
electric
heate
9_L
and
CN19_
the
control
wire
COM
of
the
con
the
control
wir
3
‐
4.4
tactor
of
pump
wn
in
Fig.
3
‐
4.5
The
wired
contr
U60(M)
‐
RN1L
AC contactor
Aqua
Tem
and
the
ground
he
grounding
w
box
of
the
unit
el,
to
avoid
mal
‐
ers:
the
control
_N
of
the
main
es
of
AC
contac
nnector
XT1
in
t
res
of
AC
conta
must
pass
the
5
roller
is
built
‐
in
mpo
Supe
ding
devices
wires
can
preven
t.
‐
operation
and
wires
of
AC
unit,
as
shown
ctor
of
the
the
electric
box
ctor
of
pump
connection
the
electric
er
II
65
Pa
rt
3
‐
Ins
talla
tion
and
Field
Se
tt
ings
nt
in
Содержание Aqua Tempo Super II Series
Страница 1: ......
Страница 13: ...Aqua Tempo Super II 14 201902 Midea Aqua Tempo Super II Engineering Data Book...
Страница 99: ......