
2019
Table
2.7
2.7.1
By
m
foun
hole
Whe
selec
2.7.2
902
e
3
‐
2.1:
Recomm
Module
MC
‐
SU30(M)
‐
MC
‐
SU60(M)
‐
MC
‐
SU90
‐
RN
Installation
1
Damping
d
means
of
the
ndation
throu
es.
The
dampe
en
the
unit
is
cting
the
dam
2
Installation
Step
1.
Mak
block.
Step
2.
Rais
damper.
Step
3.
Plac
base.
Step
4.
Retu
Step
5.
Adju
circle
to
ens
Step
6.
The
mend
minimum
A
RN1L
≥
8
RN1L
N1L
n
of
Dampin
evices
must
Φ
15mm
dia
ugh
the
spring
er
does
not
g
installed
on
mper.
n
steps
of
the
e
sure
that
th
se
the
unit
to
e
the
unit
on
urn
the
clamp
ust
the
operat
sure
equal
he
lock
bolts
can
A
F
F
m
spacing
A
800
≥
2
ng
Devices
be
provided
meter
install
g
damper.
Se
go
with
the
u
the
high
roof
e
damper
he
flatness
of
o
the
height
n
the
damper
p
nuts
of
the
d
tional
height
ight
adjustm
n
be
tightene
Main u
Main u
Main u
B
C
000
≥
20
between
the
ation
holes
o
ee
figure
abov
unit,
and
the
f
or
the
area
f
the
concrete
suitable
for
r,
and
align
t
damper
to
th
of
the
damp
ent
variance
ed
after
the
co
Input of a
unit
unit
unit
E
E
E
Installa
C
000
≥
e
unit
and
its
on
the
steel
f
ve
(Figure
3
‐
user
can
sele
sensitive
to
v
e
foundation
installation
o
he
fixing
bolt
he
fixing
holes
er
base,
and
of
the
dampe
orrect
operat
Multiple
units
B
C
airflow
Main un
Main un
Main un
In
ation
space
(mm
D
800
foundation
frame
of
the
2.2)
for
deta
ect
the
damp
vibration,
ple
is
within
±3m
of
the
dampi
t
holes
of
the
s
on
the
unit
screw
down
er.
tional
height
s
installation
it
it
it
E
E
E
nput of airflow
A
m)
E
≥
800
unit
base,
th
ils
about
cent
er
according
ease
consult
t
mm,
and
then
ng
device.
R
e
damper
wit
base,
and
tig
the
leveling
b
is
reached.
Main unit
Main unit
Main unit
w
Aqua
Tem
F
≥
1100
he
unit
can
be
ter
distance
to
the
releva
the
technical
n
place
the
un
Remove
the
c
th
the
fixing
ghten
them
in
bolts.
Tighten
D
F
F
mpo
Supe
G
≥
6000
e
fastened
on
of
the
install
ant
requirem
engineers
be
nit
on
the
cus
clamp
nuts
o
holes
on
the
nto
the
damp
n
the
bolts
by
er
II
51
Pa
rt
3
‐
Ins
talla
tion
and
Field
Se
tt
ings
n
the
ation
ments.
efore
shion
of
the
e
unit
per.
y
one
Содержание Aqua Tempo Super II Series
Страница 1: ......
Страница 13: ...Aqua Tempo Super II 14 201902 Midea Aqua Tempo Super II Engineering Data Book...
Страница 99: ......