Midco Incinomite J121A-3 Скачать руководство пользователя страница 9

Midco International Inc.

9

8470 70

Service

Inspect the electrode wire insulation for cracks or worn areas, or any contact with the burner frame. 
Dampness will facilitate electrical leakage to ground, which will cause ignition or fl ame signal failure. 

Check that the electrode ends 
are positioned and that the 
gap between the end of each 
electrode and the ground barrier 
is spaced per Figure 5. 

Check that the Ignitor Air 
Defl ector is at the correct angle 
(45°). See Figure 4.

Ignitor trouble will be evidenced by failure of main burner ignition. It may also be indicated by poor or 
erratic relay response which cannot be remedied by ignitor gas adjustment, or it may cause frequent 
Flame Safeguard lockout. Check for dirt in the ignitor air and mixture passageways and check for 
obstructions in the ignitor ports. Also check electrode adjustments (see Figure 5). Replace any 
severely burned parts.

Proper operation of the fl ame sensor 
rod can be checked by measuring the 
fl ame signal. With the Flame Safeguard 
energized and only the ignitor burning, 
a good reading should run steady 2 or 
more volts DC.

When servicing, clean the Ignitor 
Retention Plate ports and blow out the 
internal air and gas passages. Clean 
the Electrode Insulators and check 
them for hairline cracks. Also check the 
electrode ends and the Ground Barrier 
for serious corrosion or loss of metal. 
Replace any defective parts.

Make sure that there is no debris in 
the Blast Tube that could short out the 
Spark or Flame Electrode.

Clean the Ignitor Gas Orifi ce in Tee 
Orifi ce Fitting (see Figure 5) and check 
that the orifi ce size is correct per   
Table 4.

VIII  Ignitor and 

Regulator Assembly

Continued

                   Ignitor         Recommended  Ignitor
          Type     Orifi ce         Ignitor Gas      Gas
Model     of Gas    Diameter       Pressure        Rate
J81A-3    Natural   .052 (# 55 Dr.)                 6 MBH
          Propane  .042 (# 58 Dr.)   3.5″ W.C.      7 MBH
J121A-3   Natural   .070 (# 50 Dr.)                 13 MBH
          Propane  .063 (# 52 Dr.)                 15 MBH

             

Table 4 - Ignitor Firing Rate

FLAME

SENSOR

SPARK

 

 

 

Figure 4 - General Burner Head Assembly

Figure 5 - Type “3” Ignitor and 

Regulator Assembly

Содержание Incinomite J121A-3

Страница 1: ...any phone in your building Immediately phone your gas supplier from another building Follow the gas supplier s instructions If you cannot reach your gas supplier call the re department Installation an...

Страница 2: ...zontal or 10 down ring NOTE Burner components are UL recognized CGA listed CSA certi ed and or AGA design certi ed mounted and wired The complete burner is re tested 1 Standard burners are shipped as...

Страница 3: ...ude into the incineration chamber If necessary build an extension outside of the incinerator wall to increase wall depth To change the Mounting Flange to its alternate position horizontal or 10 down r...

Страница 4: ...essive gas pressure is prevalent the regulator must be a tight shut o type to prevent high pressures from developing during stand by The regulator must have a minimum ow regulating capacity for the ig...

Страница 5: ...r to SPECIFICATIONS page 2 for ampacity Con rm that the polarity is correct hot wire to strip terminal L1 neutral L2 and that the neutral line is not subject to induced low voltage check L2 to ground...

Страница 6: ...r Ignitor Ignition Flame Safeguard and motor are powered There will be a delay until blower reaches operating speed and trips blower proving switch When the blower proving switch is made the Ignitor S...

Страница 7: ...Adjuster Setting in Numbers of Turns from Full Closed Propane Gas 2 500 BTU Cu Ft with 3 8 Main Gas Port Natural Gas 1 000 BTU Cu Ft with 5 8 Main Gas Port Gas Pressure at Main automatic Valve Inches...

Страница 8: ...h the charging door open and then with it closed Remove any temporary Door Open bypasses installed in Step 6 14 Test operation of any auxiliary operating and or limit controls 15 Load incinerator and...

Страница 9: ...ration of the ame sensor rod can be checked by measuring the ame signal With the Flame Safeguard energized and only the ignitor burning a good reading should run steady 2 or more volts DC When servici...

Страница 10: ...ose air adjustment screw Adjust the screw up or down to nd the best Flame Signal or until repeatable and stable lighto s are achieved Ignitor air ow is decreased as the screw is turned clockwise and i...

Страница 11: ...low pressure setting should be raised until the burner shuts o Reduce the setting and set the low pressure switch to restart the burner Reduce the high pressure setting until the burner shuts o Then r...

Страница 12: ...witch or timer open and or remote switch or timer open 4 L2 and 4 No voltage optional high or low gas pressure switch is tripped 5 L2 and Thermal switch terminal 1 black wire a No voltage thermal swit...

Страница 13: ...est jack in ampli er With ignitor ame on reading should be at 2 or more volts DC and steady Adjust ignitor gas pressure to obtain acceptable signal and note gas pressure and signal strength for future...

Страница 14: ...st Victoria Street Chicago Illinois 60646 toll free 866 705 0514 tel 773 604 8700 fax 866 580 8700 web www midcointernational com e mail sales midcointernational com 14 Printed in USA ISO 9001 C O MPA...

Отзывы: