background image

19

 

MIDAS Group 2019

 

 

Z2 

R2

 

R1 

Z1

 

12

 

13

 

 

 
 
 

 

5

 

5

 

15

 

14

 

14

 

15

 

10

 

9

 

10

 

6

 

6

 

3

 

5 ≠ 6

 

3

 

Содержание APOLLO QA018

Страница 1: ...oughly read the instruction and mount it in accordance with instructions contained within it In order to ensure your satisfaction and a defect free use of Midas Group products we suggest mounting our...

Страница 2: ...es in the structure of the product its components such as the shape of nozzles handle head shower NOTE In case of asymmetrical cabins mounting schemes presented in instructions concern the right side...

Страница 3: ...ME OF THE CABIN hand shower upper shower head shower Function switch Fig 2 foot massager power cold water power hot water water nozzles in the shower panel single lever mixer water valve Connect water...

Страница 4: ...he shower base outlet In line with the binding PN EN 14527 2016 standards the maximum shower base load amounts to 100 kg m2 SEALING OF SHOWER CABIN When mounting the cabin it is necessary to secure th...

Страница 5: ...lass ASSEMBLY OF ROLLS IN ALUMINIUM SLIDING SHEETS 1 Mount upper rolls to two upper holes located in the glass wing of the door and similarly mount lower rolls to the lower holes lower rolls have a bu...

Страница 6: ...ixer has led out outer external threads 1 2 to which cabin water feed must be screwed in 3 The water system of feeding water accessories of the cabin is designated for installing in the water supply n...

Страница 7: ...per functioning of the shower mixer as well as of the entire water supply system largely depends on the quality of water its hardness of calcium saturation and level of contaminants such as sand limes...

Страница 8: ...nding provisions of law on waste disposal Upon product life expiry its recyclable elements i e aluminium profiles glass should be recycled Electrical parameters Protection class against electrocution...

Страница 9: ...ust ensure that children and the elderly use the cabin tub with hydromassage only when other adults are around When regulating water temperature one must not open the inlet of hot water One must not u...

Страница 10: ...lied Calcareous sludge may be removed with citric acid or vinegar dissolved in water using a soft cloth It is recommended to install a water softening device in order to avoid sedimentation of limesca...

Страница 11: ...oup com pl If this instruction does not contain all possible issues and situations which might occur please contact our local distributors in order to obtain further explanations This device is marked...

Страница 12: ...d downward it decreases the flow In order to increase water temperature one must turn the handle to the left in order to decrease it to the right The massage function in the cabin is realized by means...

Страница 13: ...ht switch 7 press it again to switch off In order to turn the ventilator on press ventilator switch 3 press it again to switch off In order to turn the ventilator on press ventilator switch 4 press it...

Страница 14: ...MIDAS Group 2019 Mounting of the shower base version A 1 3mm M4 x16 M4 x16 M4 x16 M4 x16 13 M4 x20 M4 x16...

Страница 15: ...MIDAS Group 2020 Mounting of the shower base version B 1 3mm M4 x16 M4 x16 M4 x16 M4 x16 14 M4 x16 M4 x20...

Страница 16: ...water outlet in the shower base It is necessary to secure the siphon and the sanitary silicone outflow with a teflon tape or another equally effective method By means of spirit level set the legs in s...

Страница 17: ...16 MIDAS Group 2019 5 6 6 12 13 14 15 K x4 L M N O P R x1 S T U Tools A B C D E M4x16 x17 M4x12 F G x4 M4x10 H x4 M3 5x25 x8 M4x20 x8 I J M4x20 x8 x4 x4 x4 x3 2 3 5 1 11 7 8 9 10...

Страница 18: ...MIDAS Group 2019 2 5 11 12 13 8 8 15 9 3 10 6 7 7 17 5 6 14...

Страница 19: ...MIDAS Group 2019 T 15 5 10 5 T 9 14 6 8 6 9 18 B m4x12 5 5 5 15 15 E m3 5x25 14 15 6 5 15 14 6 7 15 14 B m4x12 N 6 15 6 m3 5x25 E...

Страница 20: ...19 MIDAS Group 2019 Z2 R2 R1 Z1 12 13 5 5 15 14 14 15 10 9 9 10 6 6 3 5 6 3...

Страница 21: ...20 MIDAS Group 2019 F M4 x20 R 3 X2 A A A m4x16 m4x16 A 13 12 X2 S A A U U U...

Страница 22: ...21 MIDAS Group 2019 O 2 M N C M4x10 X 3 M4x10 C 1 L...

Страница 23: ...22 MIDAS Group 2019 After sealing with a silicone wait a minimum of 24 hours head shower shower hydromassa ge...

Страница 24: ...n parts from production plant the period of repair may be prolonged up to 60 working days 11 Within the warranty period the client is entitled to replace the product with a new one or be reimbursed fo...

Страница 25: ...1 201 martin martiv pl WARSZAWA Damian Minakowski 513 709 703 datechm o2 pl OSTRO KA Serwis Armatury Sanitarnej Marek Salamo czyk 604 450 399 marek salamonczyk interia pl OPOLE Voivodeship OPOLE Marek...

Отзывы: