Equipment Rack Installation
System Installation
2-5
2
DS-2 IF Diversity Switch Operator’s
400462-1
Rev. A
Step 5
Secure the rack to the adjacent racks and existing superstructure where
applicable. Fasten the rack’s top braces to the superstructure using J-bolts.
If there is not an existing superstructure, the top of the rack should be braced to a ceiling or
wall.
Figure 2-4
Equipment Rack – Front View
RACK_FR
84.00"
MOUNTING
HOLES
Содержание DS-2
Страница 4: ...Notes ...
Страница 10: ...x IF Diversity Switch Operator s Guide 400462 1 Rev A ...
Страница 18: ...Specifications System Overview 1 8 IF Diversity Switch Operator s Guide 400462 1 Rev A ...
Страница 24: ...Equipment Rack Installation System Installation 2 6 DS 2 IF Diversity Switch Operator s Guide 400462 1 Rev A ...