Equipment Rack Installation
System Installation
2-4
DS-2 IF Diversity Switch Operator’s Guide
400462-1
Rev. A
2.4
Equipment Rack Installation
Step 1
Remove the top and sides of the shipping container and packaging material, free
the rack from the pallet by removing the nuts and bolts securing it in place. Refer
to
Table 2-1
for equipment rack specifications.
Table 2-1
Equipment Rack Specifications
Step 2
Remove the rack from its crate by lifting it off the mounting bolts and place it near
its final mounting location. After the rack has been raised to a vertical position,
remove the shipping support brackets the rack side rails.
Step 3
A template can be used for marking the floor location drilling holes for anchoring
the hardware (
Figure 2-3
). However, if the rack is available when these holes are
drilled, it is recommended that the rack base itself be used as a template.
Figure 2-3
Equipment Rack Template
Step 4
Hole size is determined by the type of anchor to be used. On concrete floors, use
the following hardware:
- Bolts: 3/8”, 16 x 2.
- Washers: 3/8”, Lock and flat (1 each per bolt).
- Anchors: 3/8” 16 x 2.
- Caulking Anchors:, “Diamond” type 03060,
Note:
These anchors require 3/4” holes. On wood floors, use 3/8” x 1 - 1/2”
lag bolts with lock and flat washers.
Component
Description
Finish
Black baked enamel
Uprights Channel
3.0” (76.20 mm) deep x 1.4” (34.825 mm) wide x 0.25” (6.35
mm) thick.
Base Angles
4.0” (100.016 mm) high x 6.5” (162.40 mm) deep x 0.38” (9.50
mm) thick.
Top
1” (25.40 mm) high x 0.38” (9.50 mm) thick.
1.25"
2.125"
3.00"
6.00"
12.00"
20.25"
21.00"
RACK_TEM
Содержание DS-2
Страница 4: ...Notes ...
Страница 10: ...x IF Diversity Switch Operator s Guide 400462 1 Rev A ...
Страница 18: ...Specifications System Overview 1 8 IF Diversity Switch Operator s Guide 400462 1 Rev A ...
Страница 24: ...Equipment Rack Installation System Installation 2 6 DS 2 IF Diversity Switch Operator s Guide 400462 1 Rev A ...