4-12
PCWS 2015 Setup Guide - 2nd Edition
Installing and Operating the Workstation 2015
Operation
Operation
This section presents operational procedures for the PCWS 2015 including
how to use the power button to transition the unit between the
NOPOWER
, and
ON
power states.
PCWS 2015 Operator Features
Figure 4-6 points out the location of the PC Workstation 2015 Power Button,
Green Operator LED, Magnetic Card Reader, and 15” LCD/Touchscreen.
Figure 4-6: PCWS 2015 Operator Features
Operator LCD
The Operator LCD is a 15” Active Matrix LCD with a resolution of 1024x768.
The standard 5-wire resistive or optional capacitive touchscreen is positioned
over the LCD.
Power Switch
The power switch is used by the operator to transition the Workstation between
the
NOPOWER
and
ON
states.
Operator LED
The Green Operator LED blinks during start-up and turns solid Green to
indicate the PCWS API has started.
Содержание PCWS 2015
Страница 32: ...1 20 PCWS 2015 Setup Guide 2nd Edition What is the PCWS 2015 Approvals...
Страница 68: ...2 36 PCWS 2015 Setup Guide 2nd Edition PCWS 2015 BIOS Exit...
Страница 120: ...3 52 PCWS 2015 Setup Guide 2nd Edition What s Inside Reassembling the PCWS 2015...
Страница 144: ...4 24 PCWS 2015 Setup Guide 2nd Edition Installing and Operating the Workstation 2015 Operation...
Страница 160: ...A 6 PCWS 2015 Setup Guide 2nd Edition Equipment Dimensions LCD Pole Display LCD Pole Display...
Страница 161: ...PCWS 2015 Setup Guide 2nd Edition A 7 Equipment Dimensions Cash Drawers Cash Drawers...
Страница 162: ...A 8 PCWS 2015 Setup Guide 2nd Edition Equipment Dimensions Cash Drawers...
Страница 175: ...PCWS 2015 Setup Guide 2nd Edition B 13 Connector and Cable Diagrams Hook up Cables Cash Drawer Extension Cable...
Страница 176: ...B 14 PCWS 2015 Setup Guide 2nd Edition Connector and Cable Diagrams Hook up Cables...