![MicroNet SP3524A Скачать руководство пользователя страница 8](http://html1.mh-extra.com/html/micronet/sp3524a/sp3524a_user-manual_1787948008.webp)
5
2.1 Hardware Installation
This chapter describes how to install the 24-ports VDSL managed switch to
establish network connection. You may install the managed switch on any
level surface (table, shelf, 19 inch rack or wall mounting). However, please
take note of the following minimum site requirements before you begin.
Pre-installation Requirements
Before you start actual hardware installation, make sure you can provide the
right operating environment, including power requirements, sufficient physical
space, and proximity to other network devices that are to be connected. Verify
the following installation requirement:
Verify the following installation requirements:
y
Power requirements: AC 100V to 240 V at 50 to 60 Hz.
y
The Switch power supply automatically adjusts to the input voltage level.
y
The managed switch should be located in a cool dry place, with at least
10cm/4in of space at the front and back for ventilation.
y
Place the managed switch out of direct sunlight, and away from heat
sources or areas with a high amount of electromagnetic interference.
y
Check if network cables and connectors needed for installation are available
General Rules
Before making any connections to the managed switch, note the following rules:
y
Ethernet Port (RJ-45)
All network connections to the managed switch Ethernet port must be made
using Category 5e,6 UTP for 1000Mbps, Category 5,5e UTP for 100Mbps,
Category 3, 4 UTP for 10Mbps.
No more than 100 meters of cabling may be use between the managed
switch or HUB and an end node.
y
VDSL LINE Port (RJ-21)
Содержание SP3524A
Страница 14: ...11 Configuration page c Select Quit to go back to the previous menu d Use CTRL A to go back to the last action...
Страница 19: ...16 Step1 Step Login in with User Username admin Password 123 Click OK button to enter the Configuration Menu...
Страница 24: ...21 4 5 IP Address 1 User can configure the IP Settings and fill the new values in here...
Страница 36: ...33...
Страница 46: ...43...
Страница 56: ...53 4 18 Reset System Reset 24 ports VDSL MANAGED SWITCH to default configuration...
Страница 57: ...54 4 19 Reboot Reboot the 24 ports VDSL MANAGED SWITCH in software reset...
Страница 61: ...58 RJ 21 Cable Drawing 150 cm Male to Male...