MHS Boilers REGENCY 4 MODULEK Series Скачать руководство пользователя страница 29

Ensure that system and boiler are water filled and correctly vented.
Shut the gas valve, remove the inlet pressure test point screw on the valve and connect a pres-
sure gauge. Open service cock and check with pressure gauge at inlet pressure point, that
pressure value is as quoted in technical data sheet.
Warning: if pressure value is more than 35 mbar (350 mm. w.c.) it would be necessary to fit
a reducing governor at gas inlet.

FIRST LIGHTING AND BOILER CONTROL

2.13

ROBERTSHAW 1" GAS VALVE

BURNER PRESSURE ADJUSTMENT

PILOT BURNER PRESSURE ADJUSTMENT

To regulate the boiler proceed as follows:

Select the ON-OFF mode.
Turn the boiler thermostat knob to the required temperature setting. Turn on the main
switch and the front burner switch: as soon as gas flows out from front pilot burner, the
ignition electrode shall spark for 10 seconds (check that spark is approx. 5 mm. in length).
The ignition electrode shall stop sparking.
Should the front pilot burner not light in spite of electrode sparking ensure that:

-

gas system is completely purged of air

-

pilot coil of front gas control valve is energised (24Vcc).

Should the front pilot burner light and ignition electrode should continue to spark and if
after a few seconds the ionisation control goes to “lockout”, then check:

-

at the control panel: that the phase is connected to terminal 1 and neutral to terminal 2

-

the ionisation electrode is not broken or incorrectly positioned or malfunctioning
because of humidity

-

installation has been correctly earthed and the earth cable connected to the front pilot
burner is adequately secured.

After 20 seconds of front pilot burner ignition, the main front burner should light.

Should the main front burner not light, ensure that main coil of front gas control valve is
energised (24Vcc) .

Should front pilot flame reduce or fail when main front burner is ignited, ensure that there
is not a consistent pressure reduction, indicated by the pressure gauge. In this case check
for cause of gas rate fall into gas feed pipe and its components.

Turn off the boiler through the front burner switch. Turn off the gas supply and remove the
manometer from the inlet pressure test point and refit test point screw.

23

BURNER COIL

Содержание REGENCY 4 MODULEK Series

Страница 1: ...R E G E N C Y 4 R E G E N C Y 4 INSTALLATION AND SERVICING INSTRUCTIONS FROM 9 TO 16 SECTION BOILERS COD 1274061 M O D U L E K M O D U L E K...

Страница 2: ......

Страница 3: ...table for heating large dwellings commercial or industrial buildings They are designed for use on pumped circulation systems and if used for hot water production calorifiers indirect cylinders plate h...

Страница 4: ...ilers of rated inputs between 60 kW and 2 MW IGE UP 2 Gas installation pipework boosters and compressors on industrial and commercial premises CIBSE Guide Reference sections B7 B11 and B13 British Gas...

Страница 5: ...2 4 Air supply 2 4 1 Air supply by natural ventilation 2 4 2 Air supply by mechanical ventilation 2 5 Gas connection 2 6 Water connection 2 6 1 System water treatment 2 7 Flue hood assembly 2 8 Draug...

Страница 6: ......

Страница 7: ...d off the damper shuts down the chimney avoiding heat losses through the chimney with one firing burner the damper partially closes to avoid eccessive secondary air from passing through the boiler wit...

Страница 8: ...t 300 R 1 1 4 160 710 75 1450 210 Regency 4 186 11 sect 300 R 1 1 4 260 860 75 1650 310 Regency 4 203 12 sect 300 R 1 1 4 160 810 75 1650 210 Regency 4 220 13 sect 300 R 1 1 4 260 960 75 1850 310 Rege...

Страница 9: ...20 20 20 20 20 20 pressure GPL G30 mbar 30 30 30 30 30 30 30 30 GPL G31 mbar 37 37 37 37 37 37 37 37 Burner Natural gas mbar 11 5 11 5 11 5 11 5 11 5 11 5 11 5 11 5 pressure GPL G30 mbar 29 0 29 0 29...

Страница 10: ...rmostat Overrun relay High limit thermostats Thermometer External flue hood Unassembled casing Contacts arrangement for external controls Option to operate in the two stage or in the on off mode Optio...

Страница 11: ...26X N I4 0Y I4 6Xe7 I4 6K f V4 6X h V 1 N L V 1 3 1 1 3 I4 0M I K I 6K eJ I4 Kh V4 3 1 V L V L N N L 0M V V4 6KO 1 I 6Kg V N X N 1 5 1 V4 I V 6Xf V 3 1 3 O 3 L I4 V4 V4 K eJ V4 N L V4 X L N 1 I I I 6K...

Страница 12: ...604 19 REDUCING BUSH 1 1 2x1 2 8588801 20 FRONT SECTION 1230000 21 RIGHT SUPPORT FOOT 0634304 21 LEFT SUPPORT FOOT 0634305 22 PIPE FIXING BRACKET 0648000 23 GAS FEED PIPE 1251509 1251510 1251511 12515...

Страница 13: ...SETBUTTON FOR RESETTING THE FRONT IONISATION CONTROL 14 REAR BURNER SWITCH FOR ON OFF OPERATION OF REAR BURNER 15 IONISATIONRESETBUTTON FOR RESETTING THE REAR IONISATION CONTROL 16 PUMP OVERRUN CONTRO...

Страница 14: ...REGENCY 4 MODULEK 255 750 mm 750 mm REGENCY 4 MODULEK 272 800 mm 800 mm The boiler is delivered as a consignment of four packages It is supplied complete with a draught diverter which must be fitted...

Страница 15: ...with a wire mesh to pro tect against blockage The terminal should not be sited adjacent to any opening window air vent or other ventilation opening and should be situated at least 1 m above the roof s...

Страница 16: ...r Regency 4 Modulek 237 Low Level 1615 cm2 per boiler High level 856 cm2 per boiler Regency 4 Modulek 255 Low Level 1712 cm2 per boiler High level 907 cm2 per boiler Regency 4 Modulek 272 Low Level 18...

Страница 17: ...the circulating water particularly where the system type is open vented The fill water will almost always produce a scale deposit on the waterways of the boiler This deposit will reduce the heat tran...

Страница 18: ...e aprons 6 to the front and rear plates using the stud and nut fi xings both aprons are delivered with the casing in a separate carton Insert the two multi bar burners into the combustion chamber and...

Страница 19: ...able bush pro vided and then insert it through the slots of same bracket screw the motor cable connector into the socket fixed on the bottom of control panel BEWARE the motor has been already wired an...

Страница 20: ...ep to terminals 48 49 and the switch of the 2nd step to terminals 50 51 The overrun relay fitted avoids boiler nuisance trip of the limit safety thermostat when the cir culating pump is stopped with a...

Страница 21: ...ELECTRICAL DIAGRAM REGENCY 4 152 272 9 16 SECTION BOILERS 15...

Страница 22: ...16...

Страница 23: ...17...

Страница 24: ...18...

Страница 25: ...19...

Страница 26: ...20...

Страница 27: ...21...

Страница 28: ...internal fold to the brackets 6 secure the link side panel to the front fixing bracket 5 using the screws F 4 2 x 9 5 pro vided secure the right side panel to the front fixing bracket 5 using the two...

Страница 29: ...e that gas system is completely purged of air pilot coil of front gas control valve is energised 24Vcc Should the front pilot burner light and ignition electrode should continue to spark and if after...

Страница 30: ...he main rear burner shall light Attach manometer to front burner pressure test point and turn on gas supply Turn on the front switch When front burner is fully ignited and stable adjust gas pressure o...

Страница 31: ...for obstruction To clean the boiler outer case use a damp dusting cloth only Warning always turn off the electrical supply before proceeding Do not use detergents or solvents To remove particularly re...

Страница 32: ......

Отзывы: