
5
REGENCY2
L O W
P R O F I L E
1.3 dimensional data
clearances
Models
A - Boiler Height - mm
B - Boiler Depth - mm
C - Boiler Rear/Centre Flue - mm
D - Flue Outlet Size - mm
E - Casing Depth - mm
F - Front Clearance - mm
G - Gas Connection Size - BSP
H - Side to Flue - mm
I - Side to Flue - mm
Flow Connection - BSP F
Return Connection - BSP
G - Gas Connection Size - BSP Towns Gas
G100/30 IE
850
918
113
155
638
450
1
/
2
"
255
295
2"
1"M
3
/
4
"
G100/40 IE
850
1026
113
155
725
450
1
/
2
"
255
295
2"
1"M
1"
G100/50 IE
953
1084
120
202
812
450
1
/
2
"
275
275
2"
1"M
1"
G100/70 IE
953
1260
120
202
986
450
3
/
4
"
275
275
2"
2"F
1
1
/
2
"
G100/90 IE
1005
1483
144
254
1160
600
1"
275
275
2"
2"F
1
1
/
2
"
G100/110 IE
1005
1659
144
254
1334
700
1"
275
275
2"
2"F
1
1
/
2
"
550
A
625
450
(Recommended)
150
(Minimum)
F
B
C
450
(Minimum)
H
I
Flow
332/345
77
147
70
671
Dimensions in millimetres
E
G
Return
326
Drain
154
49
D ø
63
Содержание REGENCY 2 G100/110IE
Страница 1: ...G U I D E T O I N S T A L L A T I O N S E R V I C E C L E A N I N G REGENCYL O W P R O F I L E L 111 ...
Страница 17: ...17 REGENCY2 L O W P R O F I L E fig 1 fig 2 fig 3 fig 4 1 9 5 10 2 3 5 4 12 4 8 6 7 3 1 2 ...
Страница 19: ...19 REGENCY2 L O W P R O F I L E 4 1 atmospheric boiler service commissioning report S A M P L E ...
Страница 21: ...21 REGENCY2 L O W P R O F I L E fig 5 fig 6 fig 7 fig 8 17 18 17 18 19 20 21 22 21 23 ...