18
REGENCY2
L O W
P R O F I L E
Ensure that the boiler is full of water and the system, boiler is fully vented.
Ensure that the pressure gauge on the boiler control panel reads a minimum of 0.5 bar (5m).
Ensure that an adequate gas supply is available at a working inlet pressure of 20mbar (Nat gas only) and
that the gas supply has been properly tested and purged in accordance with current Codes of Practice.
Ensure that the system pumps are running and water is circulating around the system.
fully automatic versions - G100/30-110IE
1. Switch on the on/off switch and ensure that the “green” power on indicator lamp illuminates.
2. Ensure that the external controls are calling for heat and that the “amber” “pump run” indicator lamp
illuminates and that the boiler pump (if fitted) is rotating correctly.
3. The spark ignitor should start after a short delay the burner should ignite and the spark should stop.
4. Turn off the boiler at the on/off switch.
5. Attach a manometer to the burner pressure test point and turn on the boiler, ensuring gas pressure
is not excessive.
6. Allow the main burner to operate for ten minutes and then check/adjust the burner pressure in
accordance with the figure quoted in the technical data, and record combustion readings.
7. Turn off the appliance and remove the manometer. Ensure that the test point screw is firmly tightened.
8. Check correct operation of the control and limit thermostats, and lockout also the flue spillage limit
thermostat on models G100/30-50IE.
9. Check connections for water tightness.
10. Check effective operation of the flue.
11. Instruct the user on the safe operation of the appliance and the need for regular maintenance.
Hand over operation instructions.
to turn off the boiler
1. FOR SHORT PERIODS
Switch off the on/off switch. This will leave the pilot burner alight on permanent pilot models (towns
gas only) and will obviate the need to carry out the lighting procedure when the boiler is required again.
To operate the appliance again, switch on the on/off switch.
2. FOR LONG PERIODS
Switch off the on/off switch. Turn off the gas supply at the gas isolation valve in the supply pipework
to the boiler.
Switch off the power supply at the local isolator.
Drain boiler during periods of potential frost damage.
To operate the appliance again, follow appropriate comm/testing procedure.
4.0 commissioning
testing
Содержание REGENCY 2 G100/110IE
Страница 1: ...G U I D E T O I N S T A L L A T I O N S E R V I C E C L E A N I N G REGENCYL O W P R O F I L E L 111 ...
Страница 17: ...17 REGENCY2 L O W P R O F I L E fig 1 fig 2 fig 3 fig 4 1 9 5 10 2 3 5 4 12 4 8 6 7 3 1 2 ...
Страница 19: ...19 REGENCY2 L O W P R O F I L E 4 1 atmospheric boiler service commissioning report S A M P L E ...
Страница 21: ...21 REGENCY2 L O W P R O F I L E fig 5 fig 6 fig 7 fig 8 17 18 17 18 19 20 21 22 21 23 ...