
Large Folding Goal Top
Hinge Weldment RH
Large Folding Goal Top
Hinge Weldment LH
Arrow Net Hook
Top Folding Hinge
Weldment LH
Bottom Folding Hinge
Weldment LH
Bottom Folding Hinge
Weldment RH
Top Folding Hinge
Weldment RH
M8 Spring Washer
M8 x 20 Hex Head Bolt
DETAIL, F
SCALE: 1 : 2.5
DETAIL, G
SCALE: 1 : 2.5
DETAIL, H
SCALE: 1 : 2.5
DETAIL, J
SCALE: 1 : 2.5
F
G
H
J
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
10
10
11
11
12
12
A
A
B
B
C
C
D
D
E
E
F
F
G
G
H
H
SHEET
4 OF
8
REVISION
1
Instructions for ALL
Folding Goals
MH Goals Ltd,
Ellough Industrial Estate,
Beccles, Suffolk,
NR34 7TD
Parts Required
For Larger Goals
Only
Channel nuts go in
positions 1-6
1
2
3
4
5
6
Arrow Net Hooks
Go Here
Step 2 -
For this step take the hinge brackets and the place the appropriately handed bracket on that side, the bottom brackets should match the
direction of the look of the top bracket.
For the top brackets the shorter length leg should be attached to the post, with the slotted section facing the inside of the goal.
Using the brackets as a final guide for the position of the channel nuts, place the brackets onto the goal, and fasten into position using
the supplied M8 spring washers and M8 x 20 hex head bolts.
This is done by placing the spring washer over the bolt, then placing the bolt through the hinge bracket into the channel nut previously
placed into the extrusion as shown in Details H & J using Details F & G as how the final product should appear.
For the larger goals & brackets use the guide to the left for channel nut positions.