MHGOALS FT-342 Скачать руководство пользователя страница 3

 

DETAIL, A
SCALE: 0.27 : 1

DETAIL, B
SCALE: 1 : 3

DETAIL, C
SCALE: 1 : 1

DETAIL, D
SCALE: 1 : 3

DETAIL, E
SCALE: 1 : 3

80mm Ali Crossbar

80mm Ali Upright LH

80mm Ali Upright RH

M8 Channel Nut

A

B

C

D

E

1

1

2

2

3

3

4

4

5

5

6

6

7

7

8

8

9

9

10

10

11

11

12

12

A

A

B

B

C

C

D

D

E

E

F

F

G

G

H

H

SHEET

3  OF

REVISION

1

Instructions for ALL

Folding Goals

MH Goals Ltd, 
Ellough Industrial Estate, 
Beccles, Suffolk,
NR34 7TD 

Parts Required

Channel Nuts Go Here

1

2

3

4

5

Step 1 - 

 
Take the crossbar and both post weldments and lay them all out on a flat surface 
with the channel in the back facing upwards.
 
Slide the M8 channel nuts into the channel as shown in Detail C.
 
Place 2 channel nuts into each end of the crossbar, as shown in Detail A, moving 
them to the position shown in Detail D, this position will be slightly further spread 
apart if using the larger hinges.
 
Place 2 channel nuts into the top corner of each post weldment, as shown in 
Detail A, moving them to the position shown in Detail D, this position will be 
slightly further spread apart if using the larger hinges.
 
Place 3 channel nuts into the bottom of each post weldment, as shown in Detail B,
moving 1 to the top of the post as shown in Detail D, with the 2 remaining staying
towards the bottom of the post as shown in Detail E.
If you are using the larger hinges, an extra channel nut will be required in the 
post weldment, this will moved to the top of the post so that there are 2 channel 
nuts in the post in Detail D.
 
Once the channel nuts are in position, simply slide the corner knuckles into the 
crossbar by moving the box section so that it rests on positions 1-5 shown in 
Detail C

Extra channel nut goes here if using the larger hinges

Содержание FT-342

Страница 1: ...equipment PPE must be worn at all times I E Hard hat steel toe cap boots gloves etc When tall and or heavy equipment is being assembled it is recommended that scaffolding and or heavy lifting equipmen...

Страница 2: ...Sliding Channel Nut 14 8 FT 682 M8 x 20 Hex Head Bolt 14 10 32mm Net Support for Folding Goals 2 15 FT 542 Round End Cap 4 16 FT 581 Back Bar Bracket 2 17 32mm Back Bar 1 18 FT 582 Spring Clip 2 19 F...

Страница 3: ...shown in Detail D this position will be slightly further spread apart if using the larger hinges Place 2 channel nuts into the top corner of each post weldment as shown in Detail A moving them to the...

Страница 4: ...Net Hooks Go Here Step 2 For this step take the hinge brackets and the place the appropriately handed bracket on that side the bottom brackets should match the direction of the look of the top bracket...

Страница 5: ...at in a mirrored configuration Then take the M10 x 50 hex head bolt and put it through the hole towards the bottom corner of the net support shown in Detail M do this from the outside of the goal Take...

Страница 6: ...and slot of the hinge brackets For the top bracket fix the net support in place by putting one of the supplied M10 washers over the M10 x 60 hex head bolt From the top of the bracket put the bolt thr...

Страница 7: ...SLIDING THE SWAGED REDUCED END OF ONE SECTION INTO THE OTHER HALF LINING UP THE HOLES AND FASTENING USING THE SUPPLIED M10 X 45 HEX HEAD BOLT M10 NYLOC Step 5 THIS STEP MAY REQUIRE MORE THAN ONE PERSO...

Страница 8: ...in place when in use Anchor at both ends near the Back Bar Bracket As indicated by the Anchor Point Stickers THIS BAR IS PART OF THE STRUCTURE OF THE GOAL AND MUST BE ATTACH WHEN GOAL IS IN USE GOAL...

Отзывы: