10
UG-015
( pic above = Fitting the keeper plate.)
At the top of the handrail, stretch out the chain to bridge and handrail gaps between ramp and
platform. Connect the chain from the ramp to the platform handrail, using the ‘half swivel scaffold
connector bracket’. Complete this for both handrails.
Check platform door functionality. Note – if door operation is obstructed, the door should be moved
from the platform, and attached to the ramp instead.
Handrail gaps to be
bridged using chain
and connectors
supplied
Door can be moved
to hinge from ramp
handrail if operation
is obscured