Page 30
O
per
ation of the p
ow
er gener
at
or
5.5.6.
Connection of the consumers
NOTE
Before connecting electrical consumers, check that the total load of consumers does not exceed the
power specified on the power generator’s rating plate.
Consumers can be connected even when the power generator is running.
In this case, be sure that the consumers are switched off when they are connected to the sockets.
•
Connect the consumers to the corresponding sockets of the power generator.
•
Comply with the connection values in accordance with the technical data.
5.5.7.
Earthing the power generator
EISEMANN power generators are manufactured in accordance with DIN VDE 0100/part 551 and
DIN VDE 0100/part 410 with the protective separation safety measure for protection separation with
potenzial equalization in the IT - network. The star point of the generator is not connected to the hous-
ing of the power generator. An earth connection using the earthing screw on the power generator
and an earth spike can therefore serve only to
dissipate static charges. The equipotential bonding conductor (yellow/green) must, however, be
wired and connected to all consumers.
If the power generator is equipped with a residual current protective circuit, the star point of the
generator must be connected to the casing of the power generator, and via the earthing screw to a
suitable potential equalisation conductor. An earth spike can be used for this. Please note that
before the power generator is put into operation this protective measure must be checked by a
qualified electrician, according to the currently valid regulation, for example DGUV V3. A measurement
is required for this. Correct operation of the protective measure must be documented in a test report.
A check must also be made that all potential equalisation conductors are connected without gaps and
that they are correctly connected to the consumers. The power generator is now installed as a TN-C-S
system.
Responsibility for the installation of all protective measures lies with the responsible electrician.
Before the power generator is put into operation, the correct operation of all protective measures
must be checked by an electrician.
Содержание EISEMANN BSKA 14 EV RSS cube
Страница 2: ......
Страница 20: ...Seite 18 Ihr Stromerzeuger im Detail 4 IHR STROMERZEUGER IM DETAIL 4 1 Abmessungen ...
Страница 54: ...Safety instructions Page 7 ...
Страница 65: ...Page 18 Your power generator in detail 4 YOUR POWER GENERATOR IN DETAIL 4 1 Dimensions ...
Страница 91: ......