EN
Door Control AS 210 B / Rev.A 2.0 – 5
5. Initial operation
5.1 General
To guarantee that the equipment functions properly, it must
be ensured that:
− the door is installed and operational.
− the MFZ drive motor is installed and ready for operation.
− the command and safety devices are installed and ready for
operation.
− the AS 210 B controls are installed.
REFERENCE
The relevant manufacturers’ instructions must be adhered to
for the installation of the door, the MFZ drive motor, and the
command and safety devices.
5.2 Mains connection
Preconditions
To guarantee that the controls function properly, the follow-
ing points must be ensured:
− The mains voltage must correspond to the voltage stated
on the type plate.
− For a three-phase current, a clockwise rotating field is
required.
− For a permanent connection, an all-pole main switch must
be used.
− For a three-phase connection, only 3-way automatic circuit
breakers (10A) may be used.
Detailed circuit diagram for mains connection and
motor 400 V / 3-phase
Description:
F1
Thermal fuse, control voltage
F2
Thermal overload protection for motor
K1
Protection OPEN
K2
Protection CLOSE
M
Motor (400 V / 50 Hz / 3-phase)
S3
Safety limit switch OPEN
(normally closed contact)
S4
Safety limit switch CLOSE
(normally closed contact)
S7
Safety switch, emergency manual operation (normally
closed contact)
T1 Transformer
X1
Terminal block for mains connection
X2
Terminal block for motor
X4
Terminal block for mains voltage selection
5
4W
VU
L3
L2
L1
PE
1
2
3
400V
400 V / 50 Hz
Содержание AS 210 B
Страница 1: ...NL Bedieningshandleiding AS 210 B deurbesturing AS 210 B deurbesturing Rev A 2 0 1...
Страница 12: ...1700009779...
Страница 13: ...EN Operating Instructions for Door Controls AS 210 B Door Control AS 210 B Rev A 2 0 1...
Страница 24: ...340058 80305...