Clevis Frame
Center Hole
Weather Cap
Hinge Pins
Removing Moldboard and
Lift Frame Assembly
1. Be sure moldboard is on ground! The chain can have a small
amount of tension to help support the back of the A-Frame. At this
time use a wood block to slide under the back of the A-Frame to
support and maintain level position for reattaching.
2. Remove right and left side hinge pins from A-Frame at center hole
in clevis frame.
3. Uncouple the hydraulic hoses and interconnect the hydraulic quick
couplers to prevent dirt contamination from getting in the system.
(requires optional coupler kit 07087C)
4. Lower the lift arm all the way down and detach the chain from the
lift arm.
5. Slowly back vehicle away.
If desired you may also remove the lift frame, lights, and electric
hydraulic pump assembly.
1. Remove right and left linch pin and hinge pin from receiver tube.
2. Unplug all electrical connections.
3. Slide entire lift frame assembly out.
CAUTION:
Lift frame
assembly weighs approximately 115 lbs. and to properly
manage this assembly two people are required.
To reattach moldboard and A-Frame or lift frame assembly reverse
above procedure.
10
Содержание EZ-Mount Classic
Страница 1: ...Operation and Maintenance Manual SNOW PLOWS ...
Страница 5: ...3 13 16 12 10 11 Blue E 58H 14 ...