MetriCorr
Slimline series
–
ICL-C & MasterLink Operation Manual
34 | 54
Installation Steps (Big Fink)
Figure 10: Left: Big Fink terminals. Right: Mounting brackets and Clips for Slimline Installation in Big Finks
1.
The reference electrode cable and the pipe connection(s) should be available at the top of
the Big Fink, as shown.
NB: if installing in an existing installation, additional connections (e.g., foreign pipeline,
coupon, etc.) should also be brought up so that they can be terminated correctly.
Содержание Slimline ICL-C
Страница 50: ...MetriCorr Slimline series ICL C MasterLink Operation Manual 50 54 Appendix 1 Junction Box Mounting Guide...
Страница 52: ...MetriCorr Slimline series ICL C MasterLink Operation Manual 52 54...
Страница 53: ...MetriCorr Slimline series ICL C MasterLink Operation Manual 53 54...
Страница 54: ...MetriCorr Slimline series ICL C MasterLink Operation Manual 54 54...