background image

     

MetriCorr

 

 

 

   Slimline series   

   ICL-C & MasterLink Operation Manual 

47 | 54

 

7.4

 

Setup in Webservice 

The options for satellite connected MasterLinks are limited compared to standard GSM/LTE connected 

Masterlinks, since data transfer will only be sent once a day. However, the datalogger will still do 

measurements once an hour, which is stored in the MasterLink memory to be manually transferred using 

the Metricorr App. 

Press 

“Setup” for the Masterlink you want to configure

 to enter the setup page shown below. Both 

Masterlink serial number and the unique satellite serial number and IMEI number are shown in the top 

right corner. The two parameters “Sleep(ok)” and “Sleep(Fall)” are set to fixed values and cannot be 

changed by the user. 

 

 

Setup page, MasterLink-ICL, satellite subscription 

 

 

Содержание Slimline ICL-C

Страница 1: ...Toerringvej 7 Roedovre 2610 Denmark Tel 45 9244 8080 info metricorr com Slimline series ICL C MasterLink Operation Manual Document 102272 00 Release date June 2021...

Страница 2: ...o the ICL C 16 3 2 6 Linking ER probes to your account 17 4 Line Current Sensor 18 4 1 LC input voltage range 18 4 2 Connections to steel pipe or other structure 19 4 3 DC resistance LC input 19 4 4 A...

Страница 3: ...easurement campaign 48 7 4 2 Example 24h interval measurement campaign 49 7 5 App Data for satellite connected MasterLinks 49 Appendix 1 Junction Box Mounting Guide 50 Appendix 2 Solar Charger Instruc...

Страница 4: ...WebService account please email support metricorr com with the following information Account Name existing or new you wish the unit s to be assigned to User email address for new users to log in to e...

Страница 5: ...aired with a MasterLink control and communications module They are shipped preassembled as shown Figure 1 ICL C MasterLink as shipped Standard accessories Antenna LTE with 1m wire and adhesive pad Pro...

Страница 6: ...nnectors control Table 1 MasterLink Specifications MasterLink Specifications Battery Lifetime 3 years 1h logging intervals and weekly transmissions Casing IP65 Humidity 0 100 RH condensing conditions...

Страница 7: ...Target input range for DC measurements 20 mV 20 mV Resolution 0 2 V DC accuracy 1 V AC accuracy 4 V Input resistance 33 k Terminal Pipe Pipe structure connection Terminal Ref Reference Electrode conn...

Страница 8: ...his signal is triggered by a short 0 5s push on the push button Figure 4 LED flash indication Mode status Description Waiting The device is active and waiting for the next measurement to be performed...

Страница 9: ...ion 1 For data safety it is recommended that your assigned password should be changed on your first login This can be done in the Profile menu You should also Logout when you have completed your sessi...

Страница 10: ...T communication data transfer Next wakeup UTC 13 Jan 2021 12 50 32 UTC time stamp of NEXT communication attempt Status OK 348 logger lines received OK indicates that communication went well 348 logger...

Страница 11: ...WebService to update Refresh your browser page if it does not appear within 1 minute Should the unit not display on the MasterLink page restart the unit to force new communication 3 2 1 Setup of ICL C...

Страница 12: ...MetriCorr Slimline series ICL C MasterLink Operation Manual 12 54 Now the Setup page will be shown In the following sections the setup page will be described in detail...

Страница 13: ...ily for normal operation Sleep OK hours in order to preserve battery life The existing settings are shown under Latest Registration For a new unit this will be blank Installation mode After initial po...

Страница 14: ...tup page shown below Start time HH MM UTC sets the time of the first sample to be measured Sample interval min sets the interval for the next sample to be measured The unit will continue to perform me...

Страница 15: ...h of the periods specifies a measurement there will be repeated on weekly basics all setup is in UTC Time For example three periods are enabled in the weekly schedule 1 Every Monday starting at 10 15...

Страница 16: ...de the unit Connected means that the ER probe is connected to the Pipe terminal Native means that the ER probe is NOT connected to the Pipe terminal which is used for corrosion measurements in free ai...

Страница 17: ...ER probe configuration Click Component ICL ER Probe The landing page will now show Your Probe Certificate data Click Create Sensor The landing page is displayed to the right where a new sensor probe c...

Страница 18: ...current in the pipe depends on many fluctuating factors such as soil moisture level and is therefore not calculated in WebService The LC input consists of the two terminals LC and LC which are galvan...

Страница 19: ...d steel pipe only depends on the DC resistance of a given length of the steel pipe which is a fixed value Does not change with soil moisture level etc Since the DC resistance of a given length of stee...

Страница 20: ...an of the pipe 100m is given by 20 20 1 45 13 8 Maximum peak current before clip 1 2 1 2 1 45 828 4 4 AC measurements for a steel pipe LC input The LC input offers an AC voltage measurement to be disp...

Страница 21: ...1 Create Line Current Sensor Click on Components R LCS The landing page Your LCS Sensors is shown below The list shows all your LCS Sensors In this example there are two LCS sensors LCS FGA and min l...

Страница 22: ...e Any comment that describes the pipe section or part of the structure Nominal calculations input values for online DC resistance calculator for a steel pipe Span 100 m Span or length of the pipe sect...

Страница 23: ...n or structure to calculate the actual RLcs Dc value Check the Or find RLcs Dc by calculation box The online calculator takes values for currents and voltages measured both ways and sets RLcs Dc to th...

Страница 24: ...CS The window to the right will be shown Click on Rho table Specific Resistivity table Your defined Specific Resistivity Table will be shown To create a new material Click on Create new entry Type in...

Страница 25: ...Current Sensor LC Sensor LC Sensor performs measurements of both the LC inputs and the Pipe Ref voltage input simultaneously Click DATA I LCS to view the LCS sensors linked to your account To view th...

Страница 26: ...hown Graphs 1 ILcs is the Line Current measurement LC and LC 2 Edcon Eoff is the simultaneous DC voltage measurement Pipe Ref 3 Uac is the simultaneous AC voltage measurement Pipe Ref Click Download V...

Страница 27: ...potential in microvolts Edc V 0 000 DC voltage measurement in volts Eoff V Off DC voltage measurement in volts LC and LC terminals Ion Lcs mA On state current in milliamps Ioff Lcs mA Off state curren...

Страница 28: ...embly are described in the relevant sections below 5 1 Solar Junction Box Installation The junction box itself can be installed on a stable wooden pole metal tube or test station pipe such as a big fi...

Страница 29: ...MetriCorr Slimline series ICL C MasterLink Operation Manual 29 54 ICL C module Figure 7 Interior of Solar Junction Box as Battery and solar connected...

Страница 30: ...e cable and wires to LC input NOT shown 1 ICL C RMU Unit 2 Solar Charge Controller 3 Antenna 4 Power from solar panel 5 Battery 6 Power connector to Slimline VL100 7 Input Pipe black reference yellow...

Страница 31: ...3 Installation of wires cable to LC and LC shall be done according to the same procedure as for the Pipe and Ref connections Note Connectors for LC and LC not shown Important Please follow the sequen...

Страница 32: ...ctor blue wire from solar panel insert it into the solar panel terminal marked Panel and tighten the screw terminal 6 Finally check that the circular power connector are connected to the power socket...

Страница 33: ...e a Big Fink type test post with probe or sensor as shown in the general illustration Please note the illustration below is depicted with a ICL MasterLink from the slimline series with two ER probe ch...

Страница 34: ...g brackets and Clips for Slimline Installation in Big Finks 1 The reference electrode cable and the pipe connection s should be available at the top of the Big Fink as shown NB if installing in an exi...

Страница 35: ...anana plugs depending on the existing setup making off the cable ends with banana plugs before installation of the logger may be necessary 4 LC input Connect the two wires from the pipe to LC and LC T...

Страница 36: ...y bent or trapped between the logger and the side of the test post 7 Brackets The logger should be lowered until the Big Fink top attached to the bracket can be correctly seated on top of the pole Tig...

Страница 37: ...e g in test stations with the battery solution Connections to the existing standard terminal board in the solar solution are possible These additional connections are NOT necessary for the installatio...

Страница 38: ...the power supply socket on the MasterLink module as per step 5 above Once power is connected ensure that the logger is ON and set up correctly see Section 3 Secure the hat onto the top of the pole usi...

Страница 39: ...only that power cord connected to connector E Figure 2 as per step 3 above Once power is connected ensure that the logger is ON and set up correctly see Section 3 Secure the hat onto the top of the po...

Страница 40: ...nce your unit s have logged and sent the first set of data you can view it by clicking the Data heading and selecting the type of data you wish to see in the case of the ICL C this will be I LCS This...

Страница 41: ...Download View 6 2 Unit Pipeline Location Assignment A sensor probe can be assigned to a pipeline and specific tag location for easy data identification You can define the specific information regardi...

Страница 42: ...on the main Data or landing page by clicking Alert Settings 1 Set alert for all probes shown for this parameter 2 Set Alert for this parameter for this specific probe sensor only 3 View triggered aler...

Страница 43: ...ine series ICL C MasterLink Operation Manual 43 54 6 4 Reports It is possible to generate a chainage graph for a specific pipeline with average minimum and maximum values over a specified period in th...

Страница 44: ...housed in a 40cm x 40cm x 20cm cabinet as shown below Similar to the Solar Junction Box described in section 5 The satellite modem is mounted under the top of the cabinet and is connected to the Maste...

Страница 45: ...tworks the microwave L band can t penetrate solid objects Operating RockBLOCK through windows not recommended Apart from causing long session timeouts windows with UV protection films will also block...

Страница 46: ...n it is ready to operate When the relay is switched off the modem will stay on indicated by the red LED for a while until the super capacitor has been discharged 7 3 Webservice Subscription In WEBserv...

Страница 47: ...ll do measurements once an hour which is stored in the MasterLink memory to be manually transferred using the Metricorr App Press Setup for the Masterlink you want to configure to enter the setup page...

Страница 48: ...MM UTC 12 00 Sets time for daily measurement If the interval between measurements set in the row below is set to be longer than 24h the time set here will be valid for the first measurement only Time...

Страница 49: ...urements for monitoring to allow for immediate action if for example the corrosion rate has accelerated Hourly measurements can then be collected for example once a year using the Metricorr app to get...

Страница 50: ...MetriCorr Slimline series ICL C MasterLink Operation Manual 50 54 Appendix 1 Junction Box Mounting Guide...

Страница 51: ...MetriCorr Slimline series ICL C MasterLink Operation Manual 51 54 Appendix 2 Solar Charger Instructions MetriCorr installed Genasun models GV 4P Pb 12V in Solar Junction Box...

Страница 52: ...MetriCorr Slimline series ICL C MasterLink Operation Manual 52 54...

Страница 53: ...MetriCorr Slimline series ICL C MasterLink Operation Manual 53 54...

Страница 54: ...MetriCorr Slimline series ICL C MasterLink Operation Manual 54 54...

Отзывы: