Follow the steps listed in
to set up the AROYA Repeater.
Table 2 Repeater (H110) Installation
Preparation
Consider the Surroundings
METER recommends installing the Repeater in the hallways about shoulder
height to enhance transmission of data from sensors throughout the facility
back to the Gateway.
Mounting
Install the Repeater at approximately shoulder height in a hallway. Use
screws inserted into the mounting bracket to secure to wall.
Configuration
All system configuration work is done at METER before installation occurs at
the customer site.
Connecting
Connect Repeater to PoE and Verify
Connect one end of this cable to the Repeater (
) and the other to the
PoE Router or a PoE injector.
Verify the Repeater is connected to the internet and functional by looking
through the device page in AROYA or looking for a steady blue LED light on
the surface shown in
Follow the steps listed in
to set up the AROYA Climate Station.
Table 3 Climate Station (H111) Installation
Tools Needed
Grow light hanger (e.g., rope ratchet clip hanger)
Chain, cable, or rope
Preparation
Consider the Surroundings
METER recommends installing the Climate Station in the center of each room
of the greenhouse to facilitate quality communication to the Gateway.
The Climate Station should be in an area where the environment is as
consistent as possible. If a fogger is set up in the center of a room, set up the
Repeater in a location away from the fogger.
Mounting
METER recommends installing the Climate Station in the center of the room
just over the canopy using the light hanger pulley provided.
Configuration
The Climate Station needs to be assigned to the room that it is installed in.
Connecting
Connect Climate Station to PoE and Verify
Securely hold the cable gland on the Climate Station side, and unscrew the
outer cover from the side that is open. Remove the the cap and grommet.
Follow the steps below, referring to
• Slide the water-tight coupling
pieces
onto the PoE Ethernet cable in
the following order: cap, blue seal grommet, outer cover.
• Plug the PoE connector into the coupling.
• Screw the outer cover
on
to the coupling
and tighten
.
• Slide and push the blue seal grommet into the outer cover flexible prongs.
• Screw the cap on
to
the
outer cover, over the
grommet
,
and tighten (do not
overtighten).
4
OPERATION
Содержание AROYA H110
Страница 1: ...AROYA...
Страница 18: ...Figure 11 AROYA sensor nose bottom view 16 System...
Страница 30: ......