blue’Log X series
111 | 120
14.5
Power Control checklist
1.
Is the chosen Power Control procedure suitable for the grid operator's specified
target values?
2.
Is the chosen Power Control procedure supported by the inverters?
3.
Are the grid operator's remote control system interfaces compatible with the
blue’Log interfaces?
4.
Are there any specific features to be taken into account using the chosen active
power procedure?
5.
Are all necessary meters or a power quality analyzer installed in the PV system?
6.
Are all necessary meters or a power quality analyzer configured in the blue’Log?
7.
Is the correct data logger mode selected?
8.
Are the PV system's technical data stored correctly?
9.
Are the Power Control procedures and any advanced settings (e.g. gradient
limitation) configured correctly?
10.
Have the fallback procedures (in the case of reactive power procedures only) and
the fallback values been set up?
Содержание blue'Log X series
Страница 1: ...blue Log X series X 1000 X 3000 X 6000 Operating Manual Version 20150922...
Страница 123: ......