
METAL-FACH
Heating Technology
15
requirements for ventilation are the same as for boiler rooms with lower powers; additionally, in boiler
rooms, the power of which exceeds 400 kW, apart from the supply and exhaust ventilation, mechanical
ventilation should be provided, periodically turned on when filling fuel and deslagging the boilers,
ensuring a minimum of 10 complete air changes per hour;
in the boiler room, illuminating the boiler from its front, and the area of windows should be at least 1/15
of the boiler room floor area; half of the installed ones should be opened; electric lighting and an electric
socket with a voltage not exceeding 24 V, should also be in the room;
there should be a drain in the floor to cool the water, and its capacity should be equal to the water
capacity of the largest boiler, but not more than 2 m
3
;
in the boiler room, thermal pipes should be insulated;
The positioning of the boiler with the minimum required distances is shown in the diagram of the boiler
room below.
Minimum distances to place the boiler in the boiler room
Содержание SEMAX OPTI 16
Страница 2: ......
Страница 12: ...METAL FACH Heating Technology 10 Boiler dimensions User Installer Boiler SEMAX OPTI...
Страница 32: ...METAL FACH Heating Technology 30...
Страница 38: ...METAL FACH Heating Technology 36...
Страница 40: ...METAL FACH Heating Technology 38...
Страница 42: ...METAL FACH Heating Technology 40...
Страница 49: ...METAL FACH Heating Technology 47...
Страница 50: ...METAL FACH Heating Technology 48...
Страница 51: ......