background image

 

 

User manual 

 

Metacon-Next OHD-C EI(1) 60 / EI(2) 90 / EW 90 

Metacon-Next OHD-C EI(1) 120 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

This is a manual translated into English

 

Metacon-Next B.V. 
Zuidbaan 450 
2841 MD Moordrecht 
The Netherlands 
Tel. :  +31 (0) 182 23 15 25 

www.metacon-next.com

 

[email protected]

 

 

Metacon-Next B.V. 
Randweg 19 
8304 AS Emmeloord 
The Netherlands 
Tel. :  +31 (0) 182 23 15 25 

www.metacon-next.com

 

[email protected]

 

 

Содержание OHD-C EI 120

Страница 1: ...a manual translated into English Metacon Next B V Zuidbaan 450 2841 MD Moordrecht The Netherlands Tel 31 0 182 23 15 25 www metacon next com info metacon next com Metacon Next B V Randweg 19 8304 AS E...

Страница 2: ...ical Specifications 9 6 Product 9 7 Installation preparation 10 7 1 Essential tools for installation 10 8 Installation Instructions 11 9 Initial use 33 10 Maintenance faults and repairs 33 10 1 Regula...

Страница 3: ...lf It is the responsibility of the installation company to install the door in accordance with the operating instructions The operating instructions should remain with the door at all times Type marki...

Страница 4: ...rights reserved It is not permitted to copy duplicate translate edit and store this manual or portions thereof in any electronic medium without prior written permission from the copyright holder 2 In...

Страница 5: ...ility of the installation company to ensure that they work in accordance with the relevant instructions and regulations Any damage or injury incurred as a result of non compliance with this user manua...

Страница 6: ...then immediately close again When the door is installed in an escape route ensure that the door is suitable for intended use escape door EN 16034 2 EN 14351 1 and 2 In the case of hold to open hold to...

Страница 7: ...avitational self closing failsafe system on our products the fire resistant doors 2 optical and 1 acoustic signals with autonomous power supplies will be provided in accordance with standard EN 12604...

Страница 8: ...durability If irregularities are detected while operating the door stop operating and contact the supplier Possibly an unsafe situation arises cordon off the area so that the passageway cannot be used...

Страница 9: ...er the door and will close immediately Optionally the photocell curtains can be kept temporarily active and closed after a set time with a force lock It is strictly forbidden to place goods materials...

Страница 10: ...the dimensions according to Technical Drawing are leading Check the mounting surface for obstructions Check that the surface is level for installation as indicated on the technical drawing Check that...

Страница 11: ...allation of the door can begin Important Fasteners are optionally provided by Metacon Next Use only fasteners suitable for the intended strength and fire resistance and appropriate to the substrate Fo...

Страница 12: ...I 1 120 18 07 2022 User manual art nr 89022 Rev 4 12 Step 2a Mounting tracks horizontal fitting Mount the door suspension system Make sure that the guide pieces are placed perpendicular and parallel M...

Страница 13: ...0 OHD C EI 1 120 18 07 2022 User manual art nr 89022 Rev 4 13 Step 2b alternative to 2a Mounting tracks vertical fittings In case of a vertical lifting door mount the upper part of the track Check tha...

Страница 14: ...EI 1 120 18 07 2022 User manual art nr 89022 Rev 4 14 Step 3 Mounting wall hook Mount the wall hook at the correct height according to Metacon Installation Drawing Make sure that the space between th...

Страница 15: ...HD C EI 1 120 18 07 2022 User manual art nr 89022 Rev 4 15 Step 3b Mounting vertical mazes Mount the vertical mazes widthwise according to the Metacon Installation Drawing Check the width size Check t...

Страница 16: ...ide Place the drilling jigs according to Metacon Installation Drawing Check that it is level mark the hole pattern and remove the drilling jigs To ensure it is securely fastened use at least 3 mountin...

Страница 17: ...al art nr 89022 Rev 4 17 Place the drilling jig for the motor slide as shown below mark the hole pattern and remove the drilling jig To ensure it is securely fastened use all mounting holes Then drill...

Страница 18: ...s wall mounting Mount the consoles according to the Metacon Installation Drawing Make sure the consoles are level parallel and perpendicular to the wall Step 4c Mounting consoles ceiling mounting Moun...

Страница 19: ...heck that the safety brake is not blocked If it is blocked it must be unblocked See safety brake on data sheet for further instructions Place the bearing over the axle journal on the other side Tighte...

Страница 20: ...7 2022 User manual art nr 89022 Rev 4 20 Step 5c Drive shaft assembly Check that the shaft is mounted parallel to the wall Make sure that the space between the cable drums and left and right tracks is...

Страница 21: ...included as well as the safety brake Please note any other components may only be connected at step 11 of this manual Check that the direction of rotation corresponds to the buttons in the control box...

Страница 22: ...required length and loosen the chain Shorten the chain to the required length and lay it around the sprockets using the supplied fasteners When tensioning the chain make sure that it is not too tight...

Страница 23: ...cable drums Make sure that the cables are wound around the drums with at least 2 complete revolutions when the cables are fully suspended There must be between 1 and 3 mm of space between the cables...

Страница 24: ...e hinges as shown in the illustration below using the fasteners provided Place the bottom panel between the tracks Make sure that the distance between the tracks is equal on both sides Mount the cable...

Страница 25: ...OHD C EI 1 60 EI 2 90 EW 90 OHD C EI 1 120 18 07 2022 User manual art nr 89022 Rev 4 25 Step 7b Mounting rollers Mount the rollers on the side hinges Use the bushings to prevent the panel from moving...

Страница 26: ...own in the illustration below using the fasteners provided Place the intermediate panel in front of the daylight opening Use the supplied lifting bracket together with the wire ropes to stack the pane...

Страница 27: ...18 07 2022 User manual art nr 89022 Rev 4 27 Step 8b Assembly of side hinges and rollers Mount the rollers on the side hinges Fasten the side hinges of the underlying panel with the screws provided R...

Страница 28: ...ounting top panel Mount the top roller brackets as shown in the illustration below using the fasteners supplied Mount the rollers of the top panel on the top roller brackets Use the bushings provided...

Страница 29: ...HD C EI 1 120 18 07 2022 User manual art nr 89022 Rev 4 29 Step 9 Mounting the centre hinges Fasten all centre hinges using the fasteners provided PLEASE NOTE Do not drill but place directly in the mi...

Страница 30: ...60 EI 2 90 EW 90 OHD C EI 1 120 18 07 2022 User manual art nr 89022 Rev 4 30 Step 10 Mounting wire rope Attach the cables to the cable break protection according to the figure below MAKE SURE that th...

Страница 31: ...Metacon Next B V OHD C EI 1 60 EI 2 90 EW 90 OHD C EI 1 120 18 07 2022 User manual art nr 89022 Rev 4 31 Step 11 Connecting slack cable safety switches Guide through cable duct lower panel to LAD 2...

Страница 32: ...ing the end position below the door leaf must not hang on the wall hook When closing during an emergency the overhead door must extend to the overclose limit switch for additional information see the...

Страница 33: ...have regular maintenance carried out In order to claim on the manufacturer s warranty maintenance must be carried out at least once a year under normal use Maintenance should be performed by a compete...

Страница 34: ...kaging upon receipt Transport is relatively easy as Metacon Next only delivers semi finished products If the package weighs more than 20 kg it must be moved with suitable lifting equipment Unloading t...

Страница 35: ...ands Phone number 31 0 182 23 15 25 E mail info metacon next com Website www metacon next com Details of the installation company Company name Phone number E mail Website Drive data Manufacturer Produ...

Страница 36: ...s for proper operation 13 Control of closure at fire alarm 14 Check electrical cabling for damage and fastening 15 Check the batteries in the control unit for function and delivery date they should be...

Страница 37: ...1 120 18 07 2022 User manual art nr 89022 Rev 4 37 Appendix C OHD C EI 1 60 EI 2 90 EW 90 OHD C EI 1 120 Maintenance Log Door checked Parts replaced Comments recommendations Technician name Date Sign...

Отзывы: