3-20
Pre-Start Inspection and Operation
b. Remove the protective covers (Items 2, 6,
) from the attachment quick
connectors.
c. Wipe off the end of each of the connectors (Items1, 3,
) to remove any dirt or
debris.
Figure 3–29 Auxiliary Hydraulic Quick Connects
d. Insert the attachments’ male coupling (Item 3,
) into the female bulkhead
quick connect coupling (Item 1,
) on the machine and push until the connector
locks into position.
e. Repeat the above process to connect the attachments’ female quick connect (Item 5,
) on the other hose to the male bulkhead connector (Item 4,
) on
the machine.
f. Check the security of both connections by gently tugging on the attachment hoses to make
sure that the quick connects are seated properly.
1
2
3
4
5
6
2116
Содержание Boxer 999-935
Страница 2: ......
Страница 6: ...iv Mertz Manufacturing LLC P O Box 150 Ponca City OK 74602 Affix Stamp Here...
Страница 8: ...vi...
Страница 18: ...1 8 Safety Precautions...
Страница 26: ...2 8 Operating Controls...
Страница 52: ...3 26 Pre Start Inspection and Operation...
Страница 82: ...5 6 Troubleshooting...
Страница 83: ......