3-19
Pre-Start Inspection and Operation
5. Shut the engine off.
6. Rotate the attachment lock pins (Item 1,
) into the locked
position securing the attachment to the machine.
Figure 3–27 Attachment Locks in Locked Position
7. Start the engine and test the security of the attachment connection by fully lowering with
loader arm and tilting the attachment downwards until the front end of the tracks lift slightly
off the ground.
8. Shut off the engine.
9. Move any of the main hydraulic controls forward and backward to release any stored
hydraulic pressure.
10.Attach the hydraulic hoses to the quick connects. See
.
NOTE:
There are two hydraulic hoses that need to be connected. The quick connect system
prevents you from incorrectly connecting the hydraulic hoses, but both hoses need to be
connected for the attachment to operate.
a. Move the AUXILIARY control lever (Item 1,
) into either the FORWARD or
BACKWARD detent position. This will release the hydraulic pressure locked in the auxil-
iary hydraulic lines. Leave the control lever in the detent position.
Figure 3–28 Auxiliary Control Lever
1
1
2022
Pins Locked
ON
OFF
CRAW
L V
A
LV
E
CRAW
L V
A
LV
E
L
OW
L
OW
FLOAT
DOWN
BOOM
UP
LEFT
RIGHT
DUMP
BUCKET
CURL
CRAWL SPEED
CRAWL SPEED
T
H
R
O
T
T
L
E
A
U
X
I
L
I
A
R
Y
WARN
I
NG
WARN
I
NG
READ AND UNDER
S
TAND T
H
E
OPERATOR
’S M
ANUA
L B
EFORE
OPERAT
I
NG T
HIS M
AC
HI
NE
READ AND UNDER
S
TAND T
H
E
OPERATOR
’S M
ANUA
L B
EFORE
OPERAT
I
NG T
HIS M
AC
HI
NE
CAUT
I
ON
CAUT
I
ON
B
E
S
URE AU
XILI
AR
Y
POWER
IS I
N T
H
E NEUTRA
L
PO
SI
T
I
ON
B
EFORE
S
TART
I
NG ENG
I
NE
B
E
S
URE AU
XILI
AR
Y
POWER
IS I
N T
H
E NEUTRA
L
PO
SI
T
I
ON
B
EFORE
S
TART
I
NG ENG
I
NE
H
E
A
T
OFF
ON
S
TA
R
T
H
E
A
T
OFF
ON
S
TA
R
T
WARN
I
NG
WARN
I
NG
AREA
B
ETWEEN AND AROUND
TRACK
S M
U
S
T
B
E FREE OF
DE
B
R
IS B
EFORE ENGAG
I
NG
TRACK W
I
DEN
I
NG
SYS
TE
M
OR
DA
M
AGE TO E
Q
U
I
P
M
ENT
M
A
Y
OCCUR
.
AREA
B
ETWEEN AND AROUND
TRACK
S M
U
S
T
B
E FREE OF
DE
B
R
IS B
EFORE ENGAG
I
NG
TRACK W
I
DEN
I
NG
SYS
TE
M
OR
DA
M
AGE TO E
Q
U
I
P
M
ENT
M
A
Y
OCCUR
.
1
2101
Содержание Boxer 999-935
Страница 2: ......
Страница 6: ...iv Mertz Manufacturing LLC P O Box 150 Ponca City OK 74602 Affix Stamp Here...
Страница 8: ...vi...
Страница 18: ...1 8 Safety Precautions...
Страница 26: ...2 8 Operating Controls...
Страница 52: ...3 26 Pre Start Inspection and Operation...
Страница 82: ...5 6 Troubleshooting...
Страница 83: ......