1
2
4
5
6
7
8
9
10
11
3
12
14
IMPORTANTSAFETYinformation
TALLATIONBEFOREREADINGTHOROUGHLY
N2966
N2966
N2966
N2966
13
OwnersCopy:SAVETHESEINSTRUCTIONSforfuturereference
MT100EVO
Sectional and Tilt Garage Door Opener
Installation and Operating Instructions
This manual contains IMPORTANT SAFETY information
DO NOT PROCEED WITH THE INSTALLATION BEFORE READING THOROUGHLY
N2966
N2966
N2966
N2966
gomerlin.com.au
gomerlin.co.nz
114A3361
For Service Call
Installation Date
132A2900
RISK OF ENTRAPMENT
Repeat Safety Reverse Test monthly Door
must reverse on contact with a 40mm obstacle
placed on the floor Make necessary adjustments
AUTOMATIC DRIVE:
Keep away from the area of the door since it may
operate unexpectedly
EMERGENCY RELEASE:
To release pull down firmly on the red handle
CARTON INVENTORY
(1) Opener
(2) Hand held transmitter (2)
(3) Wireless wall control
(4) Curved door arm
(5) Hanging bracket (2)
(6) Rail bracket
(7) Header bracket
(8) Door bracket
(9) Hardware bag
(10) Rail assembly (separate carton)
(11) C-Rail bracket (2)
(12) Tilt door bracket
(13) Manual
(14) Warning Labels
Your garage door opener and rail are packed in two seperate cartons. The tiltmaster MT100EVO opener carton contains the
opener, its fitting hardware and accessories. The rail carton contains the rail and some hardware.
Rails:
Different length rails (2.2 m & 2.4 m) are available for different height doors, ensure you have the correct one.
2
RAIL SIZES AVAILABLE
3
DOOR HEIGHT:
Sectional Doors
BELT & RAIL
PART NUMBER:
RAIL LENGTH:
CEILING FIXING
POINTS: (standard)
ALTERNATE
FIXING POINT:
Up to 2.2 m
8022 CR5
3000 mm single piece
2840 mm
2950 mm
Up to 2.2 m
(not for use on J-type
tilt doors)
8322 CR5
3000 mm segmented
2840 mm
2950 mm
Up to 2.4 m
8024 CR5
3200 mm single piece
3040 mm
3150 mm
From 2.4 - 3.4 m
840 CR5
1000 mm extension
4040 mm
4150 mm
2.3 m TILT Door
820 CR5
2000 mm single piece
1840 mm
1950 mm
NOTE:
The Ceiling Fixing Point (Standard) is the position of the hanging bracket measured back from the lintel (see
item 1 to 7 of “completed installation”). Also allow 400 mm back from the fixing point for installation of the powerhead
(item 7 to 9 of “completed installation”).
The Alternate Fixing Point will position the hanging bracket between the C-Rail brackets, and may line up with a
structural support more favourably.
3