background image

3

QUICK REFERENCE GUIDE

ADJUST THE TRAVEL DISTANCE

6

1.  Release the opener manual release with the release key, see section 9. 
2.  From a complete closed position, remove the cover (A in figure 1).
3.  For right hand installation release screw D and adjust the position of the 

hardstop C to touch the arm. Tighten the screw when required position of 
the hardstop is reached.

4.  Manually move the gate to the required complete open position.
5.  Release screw E and move the hardstop B to the position where the arm is 

touched. Tighten the screw when the required hardstop position is reached.

6.  Put the cover in its original position and secure with the screw.
7.  Re-engage the manual release mechanism.  

The internal hardstops can be replaced the external hardstops of the gate or a combination of both can be used depending on 
installation situation and requirements. 

A

B

C

E

D

13 mm

13 mm

figure 1

CONTROL BOARD AND OPENER CONNECTION

7

The control board is already pre-installed in the Primary opener and pre-wired 
to the MOTOR1 terminals. 
To gain access to the control board in the Primary opener, remove the 2 
screws to the back of the cover and then remove the 2 screws on the sides 
(figure 1). The terminals for wiring accessories are directly accessible. To get 
access to the programming buttons remove the transparent plastic cover 
(figure 2) and place it back once programming is finished. Remove the cover of 
the Secondary opener, same way as with the Primary opener to gain access to 
the opener wiring terminal (figure 3).   

NOTE: As per the default settings, the Primary opener is considered 
installed on the left (when looking from inside out), and the Secondary 
opener on the right. 
In case the Primary is installed on the right, and the Secondary opener on 
the left, change the motor directions for both units in the Motor Direction 
Programming section.   

8.8.

 4 mm

Primary Opener

Secondary Opener

Extension cable
 (not supplied)

8.8.

 4 mm

Primary Opener

Secondary Opener

Extension cable
 (not supplied)

8.8.

 4 mm

Primary Opener

Secondary Opener

Extension cable
 (not supplied)

figure 1

figure 2

figure 3

OPENER CONNECTION

8

NOTE: The opener wired to the MOTOR1 terminal, will always open first and close last.

 

The Primary opener is already pre-wired to MOTOR1 terminals. No extra steps required for 
MOTOR1 wiring.

NOTE: The opener wired to MOTOR2 terminal, will always open last and close first. 

 

Connect the extension cable (not provided) to the wiring terminals of the Secondary opener. 
The cable colours of the Secondary opener should match the control board wiring terminal for 
MOTOR2.
1.  Feed the Secondary opener extension cable through one of the cable glands at the bottom 

of the Primary opener. Ensure that the cables will not be cut by the opener of the arm during operation.

2.  Connect the Secondary opener cables to the MOTOR2 terminals as follows:

•  Red cable to RED terminal
•  Green cable to GRN terminal
•  White cable to WHT terminal.

Power Wiring 

3.  Connect the pre-assembled mains power plug to the nearby general purpose 

power outlet.

4.  Tighten the IP rated gland.

Power Wiring

 

Mains power wiring must 
be done by a certified 
electrician.

Содержание Swing A 200

Страница 1: ...e operation of smooth running residential gates The maximum permissible gate size and the maximum weight must not be exceeded The gate must open and close smoothly by hand Use the opener on gates which comply with the applicable standards and guidelines Regional conditions of wind loads must be taken into account when using door or gate panels Observe the manufacturer s specifications regarding th...

Страница 2: ...14 mm figure 1 figure 2 OPENER ARM MOUNTING 3 1 Attach the opener arm to the center of the opener from the underside 2 Secure the caps with the screw and washer 13 mm 175 mm 265 mm 250 mm 280 mm figure 1 figure 2 DISENGAGEMENT OF THE MANUAL RELEASE 4 1 Remove the small front plastic cover from the opener figure 1 2 Put the key into the keyhole and turn right figure 1 3 Pull the lever down figure 2...

Страница 3: ...opener same way as with the Primary opener to gain access to the opener wiring terminal figure 3 NOTE As per the default settings the Primary opener is considered installed on the left when looking from inside out and the Secondary opener on the right In case the Primary is installed on the right and the Secondary opener on the left change the motor directions for both units in the Motor Direction...

Страница 4: ... OPENING YES P NO S 6 Press and hold The gate will start to move a If it moves in the OPEN direction press P to confirm The screen will change to show MAIN MENU DIRECTION MOTOR1 b If the gate moves in the CLOSE direction press S to confirm The screen will change to EXECUTE MOTOR DIRECTION CHANGE Press P to confirm Once the direction has been confirmed the screen will change to MAIN MENU DIRECTION ...

Отзывы: