2
QUICK REFERENCE GUIDE
STEPS 1-8 INSTALLATION
1
Take out each of the items
included in the sales kit.
Note that low voltage sales
kits MGASK-LV & MGADK-
LV includes gate transformer
(MGTR1-96VA).
Opener MGA
or MGA-LV
Manual
Quick
Reference
guide
Swing Gate Articulated Arm (MGA-ARM)
Instruction
Manual
2 x Release
Keys
Post
Mounting
Bracket
Gate
Mounting
Bracket
Clevis
Pin
Hairpin
Clip
4 x M8 x 80mm
Masonry Anchors
2 x 6mm 14mm
Bolt & Nut
Cover
13 mm Bolt
& Washer
3 x Grommets
3 x Cable Glands
2 x 4 Channel
Transmitters
Quick
Reference
Guide
Gate Transformer
240V -24V 96VA
MGTR1-96VA
2 x Opener MGA
or MGA-LV
Manual
Quick
Reference
guide
Instruction
Manual
4 x Release
Keys
2 x Post
Mounting
Bracket
2 x Gate
Mounting
Bracket
2 x Clevis
Pin
2 x Hairpin
Clip
8 x M8 x 80mm
Masonry Anchors
4 x 6mm 14mm
Bolt & Nut
2 x Cover
2 x 13 mm Bolt
& Washer
6 x Grommets
6 x Cable Glands
2 x 4 Channel
Transmitters
Quick
Reference
Guide
Gate Transformer
240V -24V 96VA
MGTR1-96VA
2 x Swing Gate Articulated Arm (MGA-ARM)
INSTALLING THE POST BRACKET
2
1. Using the post bracket as a reference, mark and drill the holes for
the post bracket (figure 1).
2. Attach the post bracket to the post using appropriate fixings.
Masonry fixings are supplied, if required. The correct fastening
material must be used based on existing installation (building /
material substance).
3. The slots on the post bracket allow for alignment. When the post
bracket is level, tighten the nuts (figure 2).
Drill holes
M8x60 Screw
Washers
Nut
14 mm
figure 1
figure 2
OPENER ARM MOUNTING
3
1. Attach the opener arm to the center of the opener from the
underside.
2. Secure the caps with the screw and washer.
13 mm
175 mm
265 mm
250 mm
280 mm
figure 1
figure 2
DISENGAGEMENT OF THE MANUAL RELEASE
4
1. Remove the small front plastic cover from the opener (figure 1).
2. Put the key into the keyhole and turn right (figure 1).
3. Pull the lever down (figure 2).
NOTE: To re-engage the opener, follow the procedure in reverse.
figure 1
figure 2
ATTACH THE OPENER AND DETERMINE THE POSITION OF THE GATE BRACKET
5
1. Bring the gate to the closed position.
2. Align the holes on the opener to the post bracket holes. Attach the opener to the post
bracket using the bolts and nuts in figure 1.
3. Attach the gate bracket to the articulated arm using the clevis pin & hairpin clip in figure 2.
4. Release the opener manual release with the release key, see section 9.
5. Position the gate bracket as shown in figure 3.
6. Temporarily secure the gate bracket to the gate leaf and opener to the gate bracket.
7. Manually open and close the gate to the required positions. Ensure the opener arm does
not bind. When opening and closing position are OK proceed with Step 8. If there is an
issue with the desired opening position, change the gate bracket position or check if the
A, B and C dimensions of the post bracket were chosen correctly.
NOTE: Be sure that
during the manual movement from close to open and vice versa there is no
obstruction or impact of the arm against the leaf or pillar.
8. Close the gate and re-engage the release mechanism.
9. Fasten the gate bracket to the gate in the correct position chosen.
.
14 mm
figure 1
figure 2
figure 3
SINGLE KITS
DUAL KITS