Mercury 6-5 Stat – Installation & User Guide
Table of Contents:
THE MERCURY RANGE .................................................................................................................................... 3
Description ......................................................................................................................................................... 3
Configuration ..................................................................................................................................................... 3
Network............................................................................................................................................................... 3
Connections ....................................................................................................................................................... 4
Input/Output Allocation Tables ........................................................................................................................ 4
Setting up the controller ................................................................................................................................... 5
Set-up Mode..................................................................................................................................................... 5
Set-up through front buttons ............................................................................................................................ 5
Set-up Function Menu...................................................................................................................................... 5
Recommended set-up method ......................................................................................................................... 6
rtc. Real time clock (This will automatically synchronise on network systems) ............................................... 6
type. view controller type ................................................................................................................................. 6
PArA. Set/view parameters (This can be achieved at the network front end) ................................................. 6
Parameter Tables:.............................................................................................................................................. 7
Parameter table for 5 Channel Thermostat ..................................................................................................... 7
Units and Probe Type........................................................................................................................................ 9
Probe Fault....................................................................................................................................................... 9
Network Configuration .................................................................................................................................... 10
IP Futura module............................................................................................................................................ 10
IP-L ............................................................................................................................................................. 10
IP-r .............................................................................................................................................................. 10
Over-ride Operation......................................................................................................................................... 11
Thermostat Over-ride: - .............................................................................................................................. 11
Normal Operation ............................................................................................................................................ 12
Frost Detect.................................................................................................................................................... 12
Invert .............................................................................................................................................................. 12
Network .......................................................................................................................................................... 12
Probe Offset ................................................................................................................................................... 12
Channel Off .................................................................................................................................................... 12
Channel Timer................................................................................................................................................ 12
Thermostat Cooling/Heating Operation ........................................................................................................ 13
Cooling Thermostat graph ............................................................................................................................. 13
Heating Thermostat graph ............................................................................................................................. 13
Viewing ............................................................................................................................................................. 14
Input/Output table for 5 Channel Thermostat ................................................................................................ 14
Display Messages............................................................................................................................................ 14
Network Alarms ............................................................................................................................................... 15
GP Timer Set-up............................................................................................................................................... 15
Specification .................................................................................................................................................... 16
General .......................................................................................................................................................... 16
Power requirements:...................................................................................................................................... 16
Relays ............................................................................................................................................................ 16
Warning:......................................................................................................................................................... 16
Inputs: ............................................................................................................................................................ 17
Installation:....................................................................................................................................................... 18
Fixing:............................................................................................................................................................. 18
Clearances: .................................................................................................................................................... 18
Wiring: .............................................................................................................................................................. 19
Over-ride input Resistors: .............................................................................................................................. 19
Fuse: ................................................................................................................................................................. 20
Cleaning: .......................................................................................................................................................... 20
Revision History .............................................................................................................................................. 21
Ensure that all power is
switched off before
installing or maintaining
this product
Revision 1.2
Page 2 of 21