
109
500 EFI Bravo
MAINTENANCE
CB73
Cleaning Seawater (Raw Water) Section of Oil
Cooler
CAUTION
When cleaning engine oil or power steering coolers with the
boat in the water; be sure to close off the water supply from
the seawater pump to the cooler or water may enter the boat
when end plates or hoses are removed.
Seawater section of oil cooler should be cleaned at least once a year
or whenever decreased cooling efficiency is noticed.
1
Engine Oil Cooler - Remove end plates and gaskets. Clean oil
cooler with a suitable brush. Flush passages with fresh water. In-
spect gaskets for deterioration and replace if necessary. Install
gaskets and end plates. Tighten screws securely.
2
Power Steering Cooler - Loosen water hose clamps and re-
move hoses if it is necessary to inspect or clean cooler. If the oil
hoses need to be removed from the cooler, be prepared to cap
or plug them to avoid draining the power steering reservoir. Re-
install cooler and tighten hose clamps securely. Check power
steering fluid level.
Start engine and inspect cooling system for leaks.
CA99
Changing Positive Crankcase Ventilation Valve
This engine is equipped with a positive crankcase ventilation valve
(PCV). This valve should be changed every 100 hours of operation
or at least once a year, whichever occurs first.
•
Remove hose from PCV valve and pull valve out of intake man-
ifold.
•
Install new PCV valve in intake manifold and reconnect hose.
•
Ensure valve is tightly seated in manifold.
Use only MerCruiser replacement parts.
Содержание HP 500 EFI Bravo XR/XZ/III
Страница 2: ...2 500 EFI Bravo...
Страница 5: ...1 500 EFI Bravo 4 3 2 1 2 3 4 5 7 6...
Страница 26: ...22 500 EFI Bravo GENERAL INFORMATION Courtesy of ABYC 1 2 3 4 5...
Страница 46: ...42 500 EFI Bravo OPERATION CB218 70516 1 2 70518 70517 4 3...
Страница 48: ...44 500 EFI Bravo OPERATION 70525 70528 70526 2 4 3 1 40671 6 5...
Страница 50: ...46 500 EFI Bravo OPERATION CB181 4 5 3 1 7 6 2...
Страница 52: ...48 500 EFI Bravo OPERATION CB183 6 5 5 2 2 1 4 4 6 1 3 3...
Страница 54: ...50 500 EFI Bravo OPERATION 1 3 1 2 3...
Страница 56: ...52 500 EFI Bravo OPERATION CA34 1 2 3 5...
Страница 59: ...55 500 EFI Bravo NOTES...
Страница 60: ...56 500 EFI Bravo OPERATION CB187 73976 73977 6 5 4 3 2 1...
Страница 62: ...58 500 EFI Bravo OPERATION CB190 73979 1 b a 2...
Страница 64: ...60 500 EFI Bravo OPERATION CB190 73978 1 2 3...
Страница 66: ...62 500 EFI Bravo OPERATION 1 2 1 2...
Страница 85: ...81 500 EFI Bravo NOTES...
Страница 86: ...82 500 EFI Bravo MAINTENANCE 2 3 70543 40556 1 4 115 Quicksilver Power Trim and Steering Fluid 92 90100A12 115...
Страница 89: ...85 500 EFI Bravo NOTES...
Страница 92: ...88 500 EFI Bravo MAINTENANCE HP 1 2 3 70571...
Страница 99: ...95 500 EFI Bravo NOTES...
Страница 102: ...98 500 EFI Bravo MAINTENANCE XR XZ Models 1 2 1 2 3...
Страница 104: ...100 500 EFI Bravo MAINTENANCE XR XZ Models Anti Corrosion Grease 92 78376A6 94 4 94 a b e f c d g...
Страница 106: ...102 500 EFI Bravo NOTES...
Страница 108: ...104 500 EFI Bravo MAINTENANCE CB150 Bravo III Models 77107 1 2 3 4 5 6 7...
Страница 110: ...106 500 EFI Bravo MAINTENANCE 1 2 3 1 2 a b...
Страница 112: ...108 500 EFI Bravo MAINTENANCE 1 2...
Страница 118: ...114 500 EFI Bravo MAINTENANCE 5 6 70578 70577 70575 2 3 4 1 72032 71966 72029...
Страница 120: ...116 500 EFI Bravo MAINTENANCE CB170 1 3 71176 1 2 3...
Страница 125: ...121 500 EFI Bravo ok MAINTENANCE LOG Date Maintenance Performed Engine Hours...
Страница 128: ...124 500 EFI Bravo COLD WEATHER OR EXTENDED STORAGE 2 4 a c e f d b...