4-56 - POWERHEAD
90-830234R3
DECEMBER 1997
REATTACH CRANKCASE COVER
•
After the application of the Loctite Master Gasket
Sealing Kit, place crankcase cover onto block,
and align.
•
Recheck that bolt holes and bolts are clean to as-
sure accurate torque.
•
Insert bolts - note 2 sizes and finger tighten.
•
Install last end cap bolt in remaining (End Cap to
Cover) hole.
•
Torque Crankcase Cover Bolts.
IMPORTANT: This is a Double Torque Pattern.
10
6
2
4
8
12
9
5
1
3
7
11
6
5
2
1
4
3
8
7
3 Cylinder Models
4 Cylinder Models
Torque large bolt sequence first.
1st Torque Pattern (#1-8) on Large Bolts -
25 lb. ft. (33.9 N
m)
2nd Torque Pattern (#1-12) on Small Bolts -
18 lb. ft. (24.4 N
m)
•
Torque all (lower) end cap bolts (3 bolts) to
18 lb. ft. (24.4 N
m).
•
Reattach bleed line hose.
NOTE: Inspect ALL hoses on reinstallation; replace
when necessary.
Note on Major Cover Gaskets: These are new gas-
kets impregnated with a coating that causes the gas-
ket to retain torque. It is not necessary to use sealant
on gasket, or Loctite on bolts.
Cylinder Block Cover
•
Align cover and gasket on block.
a
b
a - Cover
b - Gasket
•
Install thermostat cover and components, as fol-
lows:
1. Insert poppet valve (a) into valve seat (b).
2. Install cover gasket (c) over poppet.
3. Insert thermostat (d) into well.
4. Align cover, with poppet spring (e) seated as
shown.
5. Depress cover, and insert bolts - finger tighten.
Note seating of thermostat gasket (f) and poppet dia-
phragm (g). These, and carrier (h) are replaceable
when necessary.
a
b
h
d
e
c
g
f
1
2
2
1 - Screw – Drive Tight
2 - Thermostat/Poppet Valve Cover Screws – Torque to
18.lb.ft (24.5Nm)
Содержание 100 FourStroke
Страница 5: ...1 A 52485 IMPORTANT INFORMATION SPECIFICATIONS ...
Страница 13: ...1 C IMPORTANT INFORMATION GENERAL INFORMATION ...
Страница 23: ...1 D IMPORTANT INFORMATION OUTBOARD INSTALLATION ...
Страница 37: ...A 2 53970 ELECTRICAL IGNITION ...
Страница 81: ...B 2 11669 ELECTRICAL CHARGING AND STARTING SYSTEM ...
Страница 108: ...C 2 22480 ELECTRICAL TIMING SYNCHRONIZING ADJUSTING ...
Страница 119: ...D 2 ELECTRICAL WIRING DIAGRAMS ...
Страница 146: ...A 3 53992 FUEL SYSTEM FUEL PUMP ...
Страница 148: ...90 830234R3 DECEMBER 1997 FUEL SYSTEM 3A 1 Notes ...
Страница 161: ...B 3 FUEL SYSTEM CARBURETOR ...
Страница 190: ...C 3 FUEL SYSTEM OIL INJECTION ...
Страница 192: ...90 830234R3 DECEMBER 1997 FUEL SYSTEM 3C 1 Notes ...
Страница 211: ...4 20032 POWERHEAD ...
Страница 215: ...90 830234R3 DECEMBER 1997 POWERHEAD 4 3 Notes ...
Страница 238: ...4 26 POWERHEAD 90 830234R3 DECEMBER 1997 Throttle Lever Models 80Jet 100 115 125 95 2 4 C With Teflon 92 825407A12 ...
Страница 276: ...4 64 POWERHEAD 90 830234R3 DECEMBER 1997 4 Cylinder Fuel Enrichment Accelerator Pump Hose Routing ...
Страница 292: ...A 5 MID SECTION CLAMP SWIVEL BRACKETS DRIVE SHAFT HOUSING ...
Страница 294: ...90 830234R3 DECEMBER 1997 MID SECTION 5A 1 Notes ...
Страница 317: ...5 51485 B MID SECTION POWER TRIM S N USA 0G360002 BEL 9934136 BELOW ...
Страница 359: ...C 5 55331 MID SECTION POWER TRIM S N USA 0G360003 BEL 9934137 UP ...
Страница 364: ...5C 4 MID SECTION 90 830234R3 DECEMBER 1997 Notes ...
Страница 408: ...5 D MID SECTION SHOCK ABSORBER ...
Страница 413: ...5 E MID SECTION MANUAL TILT ...
Страница 451: ...A 6 791 H LOWER UNIT GEAR HOUSING ...
Страница 489: ...6 B LOWER UNIT JET DRIVE ...
Страница 491: ...90 830234R3 DECEMBER 1997 LOWER UNIT 6B 1 Notes ...
Страница 513: ...A 7 50099 ATTACHMENTS CONTROL LINKAGE THROTTLE SHIFT LINKAGE ...
Страница 543: ...7 B ATTACHMENTS CONTROL LINKAGE TILLER HANDLE ...
Страница 545: ...90 830234R3 DECEMBER 1997 ATTACHMENTS CONTROL LINKAGE 7B 1 Notes ...
Страница 567: ...51605 8 MANUAL STARTER ...
Страница 569: ...90 830234R3 DECEMBER 1997 MANUAL STARTER 8A 1 Notes ...