![MerCs ME-PM-M4-5 Скачать руководство пользователя страница 8](http://html.mh-extra.com/html/mercs/me-pm-m4-5/me-pm-m4-5_user-manual_1772967008.webp)
02 4047 0777
www.mercs.com.au
02 4047 0788
8
Strider M4 V2
ME-PM-M4-5
MerCs Pty Ltd, 55 Pendlebury Rd, Cardiff, NSW, 2285, Australia | 2019 V1.1
DIT Demand Integration Time
This sets the period in minutes over which the current and power readings are integrated for maximum demand measurement. The options are: off,
5, 8, 10, 15 20, 30, 60 minutes
1
From the set up menu, use and buttons
to select the DIT option. The screen will show the cur-
rently selected integration time.
2-1
Press to enter the selection routine. The cur-
rent time interval will flash
2-2
Use and buttons to select the time
required.
2-3
Press to confirm the selection.
SET indicator will appear.
M
M
P
P
E
E