9.  If the device can not be repaired at the place of its installation, "MERCOR" SA reserves the necessity 

of its disassembly, possible delivery to the address indicated by "MERCOR" SA and re-assembly. 
The cost of this operation lies with the buyer / holder of the guarantee. 

10.  The warranty does not cover: 

  Any damage or failure of the equipment caused by improper operation, tampering, failure to 

conduct  periodic  technical  inspection  and/or  maintenance  established  in  the  Operating  and 
Maintenance Manual, section “SERVICING AND MAINTENANCE”. 

  Any damage beyond reasonable control of “MERCOR” SA, and specifically: caused 

by force majeure, such as torrential rainfall, flooding, hurricanes, inundation, lightning 
strike,  power grid  overvoltage, explosion,  hail, collision  with  aircraft,  fire, avalanche, 
landslide and indirect damage due to those causes. Torrential rainfall is understood as 
any rainfall with the effectiveness factor of 4 or higher in accordance with the definition 
of  the  Polish  Institute  of  Meteorology  and  Water  Management  -  National  Research 
Institute  (IMGW-PIB).  If  the  effectiveness  factor  value  specified  in  the  preceding 
sentence cannot be reasonably established, the actual condition and extent of damage 
shall be considered at the site of their origin as the action of torrential rain. Hurricane 
is understood as any wind with a minimum speed of 17.5 m/s (and damage shall be 
recognised as caused by hurricanes if the effects of such weather phenomenon has 
been found in the direct vicinity of the damaged property). 

  Damage due to failure to immediately report any defect found. 

  Deterioration in the quality of coatings due to natural weathering/ageing. 

  Defects caused by abrasive or aggressive cleaning agents. 

  Damage caused by aggressive external influence, specifically chemical or biological 

in nature, or when the origin of which is related to the production processing or activity 
carried out within the facility protected by the equipment or in its direct vicinity. 

  Wearing  parts  and  consumables  (e.g.  gaskets/seals),  unless  they  have  defects  of 

workmanship and/or material. 

  Damage  caused  by  improper  transport,  handling,  unloading  and/or  storage  of  the 

equipment. 

  Damage  caused  by  installation  of  the  equipment  in  violation  of  this  Operating  and 

Maintenance Manual and/or good construction practice. 

  The equipment and/or parts thereof with removed or damaged nameplate (rating plate) 

and/or warranty seals. 

11.  The  buyer/warranty  rights  holder  is  required  to  operate  the  equipment  properly  and  carry  out 

technical  inspection  and  maintenance  in  accordance  with  the  section  “MAINTENANCE  AND 
SERVICING” in the following Operating and Maintenance Manual.  

12.  This warranty shall be made immediately void and null if: 

  The buyer/warranty rights holder modifies the product design without prior authorisation from 

“MERCOR” SA. 

  Periodic  technical  inspection  and/or  maintenance  is  not  carried  out  per  schedule  and/or  is 

carried  out  by  unauthorised  personnel  or  service  providers  not  authorised  to  do  so  by 
“MERCOR” SA and/or the equipment has not been properly operated. 

  Unauthorised  personnel  attempts  any  intervention  in  the  product  outside  of  the  normal 

operation and maintenance of this equipment. 

  The device's thermal trigger was affected by a temperature greater than Tmax (page 3 of the 

Operation Manual). 

13.  Any circumstances listed in Item 10 will relieve “MERCOR” SA from the obligation of surety.  

 

The relevant provisions of the Polish Civil Code shall apply to all matters not regulated in these Warranty Terms & Conditions. 
 

Содержание mcr FID WING

Страница 1: ...zegorza z Sanoka 2 80 408 Gdańsk tel 0 58 341 42 45 tel fax 0 58 341 39 85 OPERATION AND MAINTENANCE MANUAL Fire protection cut off damper mcr FID WING Version 21 08 02 1 FIRE VENTILATION SYSTEMS DEPARTMENT ...

Страница 2: ...ION 6 6 1 INSPECTION BEFORE THE INSTALLATION 6 6 2 FIXING HOLE 7 6 3 EMBEDDING 7 6 4 ELECTRICAL CONNECTIONS 10 7 TRANSPORT AND STORAGE CONDITIONS 11 8 MAINTENANCE AND SERVICE 11 9 WARRANTY CONDITIONS 11 Labelling used in the operation and maintenance manual Option available Option unavailable NOTE With the date of publication of the operation and maintenance manual the previous versions are no lon...

Страница 3: ...tive humidity does not exceed 80 at the temperature of 20 ºC the ambient temperature is between 20 ºC and 40 ºC there are no vibrations The device is equipped with a thermal release containing one time temperature fuses During normal operation the above mentioned element should be protected against the impact of the permissible temperature Tmax see the table below When it is exceeded the temperatu...

Страница 4: ...D WING type fire protection cut off damper has the following fire resistance EI60S S V V M T G EI120S S V V M T G EI60 S V V M T G EI120 S V V M T G E60S S V V M T G E120S S V V M T G E60 S V V M T G E120 S V V M T G Performance versions The mcr FIND WING type fire dampers may be manufactured as rectangular fire dampers round fire dampers Dimension range The mcr FID WING type dampers are manufactu...

Страница 5: ... actuation of the axial electric actuator with a return spring as the supply voltage disappears automatically by actuation of the thermal release and the power spring The structure of the system equipped with an air diffuser enables the regulation of efficiency during normal operation of the device setting the gap between the body of the mechanism and the valve plug The adjustment is made by rotat...

Страница 6: ...wing space dividing elements walls or structural floors masonry concrete walls with the minimum thickness of 100 mm brickwork walls or blockwork walls with the minimum thickness of 100 mm walls made of boards with the minimum thickness of 100 mm structural floors with the minimum thickness of 150 mm for EIS120 and 100mm for EIS60 Additionally fire dampers may be installed outside walls in dampers ...

Страница 7: ...stallation min D 100 max D 600 in the case of concrete and masonry partitions and in the ceiling and dry installation Wall Ceiling Wet installation Dry installation 6 3 EMBEDDING SETTING THE DAMPER INSTALLATION IN A PLASTERBOARD CONCRETE OR MASONRY WALL Insert the connection duct in the assembly opening so that the axis of the channel coincides with the axis of the opening The gap between the duct...

Страница 8: ...nt based mortar The manufacturer allows the use of other materials with parameters that confirm and ensure the appropriate class of fire resistance for the applied method of assembly 1 mcr FID WING damper 2 Insulating band 3 Ventilation duct 4 Mortar or mineral wool 5 Drywall 6 The 12 5mm drywall board band X Wall thickness installation of the mcr FID WING damper in plasterboard walls for EIS120 R...

Страница 9: ...ased mortar The manufacturer allows the use of other materials with parameters that confirm and ensure the appropriate class of fire resistance for the applied method of assembly 1 mcr FID WING damper 2 Insulating band 3 Ventilation duct 4 Mortar 5 Rigid walls 6 The 12 5mm drywall board band 7 Mortar or mineral wool X Wall thickness installation of the mcr FID WING damper in rigid walls for EIS120...

Страница 10: ...on plaster or cement mortar The manufacturer allows the use of other materials with parameters that confirm and ensure the appropriate class of fire resistance for the applied method of assembly 1 mcr FID WING damper 2 Insulating band 3 Ventilation duct 4 Mineral wool 5 Mortar fire resistant paint 6 Drywall 7 Rigid wall X Thickness of the wall installation of the mcr FID WING damper in dry systems...

Страница 11: ...based mortar The manufacturer allows the use of other materials with parameters that confirm and ensure the appropriate class of fire resistance for the applied method of assembly 1 mcr FID WING damper 2 Insulating band 3 Ventilation duct 4 Mortar or mineral wool 5 Drywall 6 The 12 5mm GK board band 7 Mortar 8 Air diffuser X Wall thickness installation of the mcr FID WING damper in plasterboard wa...

Страница 12: ...sure the appropriate class of fire resistance for the applied method of assembly 1 mcr FID WING damper 2 Insulating band 3 Ventilation duct 4 Mineral wool 5 Mortar fire resistant paint 6 Drywall 7 Rigid wall 8 Air diffuser X Thickness of the wall installation of the mcr FID WING damper in dry systems Recommended installation of the damper in a dry system is based on wool of min 140 kg m3 with non ...

Страница 13: ...he electrical installation connect the wires of this installation properly The connection method and basic data of electrical components are presented below Electrical connection diagram of the mcr FID WING WK1 fire damper 1 black 2 gray 4 blue 1mA 4V AC min 6A 250V AC max 7 TRANSPORT AND STORAGE CONDITIONS Fire dampers are packaged in cardboard boxes or placed on pallets Dampers are protected aga...

Страница 14: ...er systems if they prevent free access to the product etc In the case of fire dampers installed in ducts it is recommended to make a service duct such as the mcr KRW type for instance If devices are installed on the roof ensure the possibility to enter the roof ladder or lift For matters relating to technical inspections maintenance and service of our products please contact the Service Department...

Страница 15: ...nd Deterioration in the quality of coatings due to natural weathering ageing Defects caused by abrasive or aggressive cleaning agents Damage caused by aggressive external influence specifically chemical or biological in nature or when the origin of which is related to the production processing or activity carried out within the facility protected by the equipment or in its direct vicinity Wearing ...

Отзывы: