![Merck EMD Millipore NovAseptic Скачать руководство пользователя страница 22](http://html1.mh-extra.com/html/merck/emd-millipore-novaseptic/emd-millipore-novaseptic_installation-and-user-manual_1772766022.webp)
Commissioning
Valid Regulations
ATEX 2014/34/EU
Complete this checklist and ensure ATEX regulations are met.
Commissioning Checkpoint
Date
Signature
Tank plates are cylindrical inside the vessel.
Use NovAseptic
®
Gauge 1.
Mixing Head freewheel.
Use NovAseptic
®
Gauge 2.
Male Bearing tightened, Male Bearing installed
metal-to-metal.
Outer Driving Head turns clockwise.
ATEX mark tape removed before starting unit.
Transport collar on the Drive Unit removed before
starting unit.
Remove the red plugs and replace them with ATEX
plugs when plugs are required.
Before each startup:
The bearings are intact.
The mixing head is properly positioned.
The mixing head is not running dry.
The mixing head is covered by liquid during all ATEX
operation.
Maximum working temperature for the mixer is 135
°C (275 °F), T4.
The parts outside the tank are allowed to be used in
Zone 1 and 21.
The process medium shall be Newtonic liquids with
viscosity from 1 to 800 cp.
Free from magnetic particles.
22
Installation and User Guide
Содержание EMD Millipore NovAseptic
Страница 2: ...2 Installation and User Guide ...
Страница 4: ...4 Installation and User Guide ...
Страница 31: ...NovAseptic GMP ATEX Mixer 31 ...