Mercia Garden Products 0634LOG209-V4 Скачать руководство пользователя страница 8

P 8

Please retain product label and instructions for future reference

             

16

Step 11

Parts needed - No. 13 QTY 108 

 

Place the first two roof board’s

(No. 13) onto the assembly on 

each side, making sure the boards

are flush to the end of the roof

purlin. Once in position fix to each 

purlin using 3x40mm screws.

Due to natural occurences of

 wood shrinkage / expansion. 

You maybe required to use

 the provided spacers and 

place a space of 2mm to 

ensure every roof board 

lines up with the truss’.

*Ensure the roof boards meet

at the top of the apex and leave

an overhang at the bottom.

Continue adding the roof boards

along the roof, fixing each one into

position using 4x40mm screws,

making sure that each board is 

interlocked, flush at the bottom &

meet at the top of the apex.

 

The last board on each

 side will

overhang: Using a staight edge

and a pencil mark out a line as 

a guide. 

Cut along the pencil mark and

remove the excess. Place the

cut down board’s back onto the

roof and secure into place

using 4x40mm screws per

board.

*Please Note: 

This image is for 

illustrative purposes and may 

differ from your choice in product. 

Nevertheless the process of cutting

and fitting the last roof boards is 

the same.

432x40mm Screws 

40mm 

screw

Pre drill 

hole

*Cut to fit

13

Pre drill 

hole

Step 10

Parts needed - No. 16 QTY 5

 

Align the Roof Purlin(

s

) (No. 

16) into the cut out slots on each 

gable top ensuring each purlin 

interlocks the boards.

 

Secure the ridge bars at each 

end by screwing through the bars 

into the boards (ensure to pre-drill 

to avoid the boards splitting) using 

4x70mm screws per purlin.

*Please note:

 The gable shown is for 

illustrative purposes and may differ 

in width from your choice in prod-

uct. 

Nevertheless, despite any differenc-

es 

the process of fixing the ridge bars 

is the same.

70mm 

screw

23b

13

13

16

a

b

a

b

a

b

a

b

Содержание 0634LOG209-V4

Страница 1: ...ring excessive dry spells due to an interior moisture loss Unfortunately these processes cannot be avoided but can be helped It is suggested that the outdoor building is sprayed with water during exte...

Страница 2: ...oard 120x34x5000mm QTY 55 LB34 A 5000 Log Board 120x34x5500mm QTY 2 LB34 AE 5500 Floor Board 121x16x2369mm QTY 84 MB16 2369 Roof Board 121x16x2629mm QTY 108 MB16 2629 Bearer 44x58x2286mm QTY 36 F4458...

Страница 3: ...locks at either end in a staggered pattern Before securing ensure that the boards are fitted properly in their respective tongues and grooves Nail Bag 40mm Screw x1356 30mm Screw x 108 P 3 Please reta...

Страница 4: ...r end of each board are flush and level with the ends of the frame Fix each of the starter boards to the frame by screwing through the notch into the frame as shown in the illustration 4x70mm Screws P...

Страница 5: ...oards No s 5 8 onto the starter boards to create your first level Ensure that the boards are level and flush with each other as you lay each one Step 4 See Pre Assembly Parts needed No 6 QTY 12 No 7 Q...

Страница 6: ...nce IMPORTANT Pre drill before fixing screws Step 5 See Window Assembly Parts needed No 1 QTY 2 Refer to window assembly instructions to assemble windows Step 6 Parts needed No 1 QTY 2 Ensure that the...

Страница 7: ...2 No 11 QTY 1 Following the same method outlined in Pre Assembly lay the last two boards No s 8 11 onto the front of the assembly Once in position place the last 2 log board s No 10 onto the plain sid...

Страница 8: ...ng a staight edge and a pencil mark out a line as a guide Cut along the pencil mark and remove the excess Place the cut down board s back onto the roof and secure into place using 4x40mm screws per bo...

Страница 9: ...flush to the log board on one side Continue adding the floor boards internally making sure to interlock each individual board Do NOT secure the boards until the last board has been measured and cut Fo...

Страница 10: ...al space 20 20 Pre drill hole 30mm screw trim to fit Step 14 Parts needed No 20 QTY 9 Inside the building place the closure trim No 20 against the boarding and align with the roof as shown in the illu...

Страница 11: ...t immediately after the building has been assembled 18 18 Pre drill hole 80mm bolt Step 18 Parts needed No 21 QTY 8 Arrange the storm braces No 21 around the building internally Place 2x storm braces...

Отзывы: