![Mercia Garden Products 0634LOG209-V4 Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/mercia-garden-products/0634log209-v4/0634log209-v4_general-instructions-manual_1772582011.webp)
P 11
Please retain product label and instructions for future reference
Step 17
Parts needed - No. 17 QTY 4
No. 18 QTY 6
Align the fascia’s (No’s. 17 &
18) with the roof and fix into
place using 4x40mm screws
per fascia, making sure to
screw through the fascia into
the roof purlins and eaves
frames.
40x40mm Screws
Pre drill
hole
40mm
screw
17
17
17
17
18
It is ESSENTIAL that you apply wood
treatment immediately after the building
has been assembled.
18
18
Pre drill
hole
80mm
bolt
Step 18
Parts needed - No. 21 QTY 8
Arrange the storm braces (No. 21)
around the building (internally ).
Place 2x storm braces per side
fixing into place using 2x 80mm
bolts per brace making sure the
washer & nut are tightened from
the outside of the building.
*Ensure the storm braces are
secured at the highest point
possible on each side.
**Storm braces will help your
building expand and contract
properly.
***Important: Ensure each
bolt is tightened using a
washer so as not to damage
the log boards.
16x80mm Bolt Sets
21
21