background image

2

1

3

Felt

4

5

6

7

8

9

12

13

14

15

16

17

19

18

Double Door Pack*

P 2

0634LOG209-V4

Overall Dimensions:

Width = 5108mm 

Depth = 5832mm 

Height = 2869mm

Base Dimensions: 

Width = 4818mm 

Depth = 4818mm 

Before assembly  

please make sure you have a 

suitable base ready to erect your 

building 

 

MADE IN GREAT BRITAIN

Short Window Pack*

QTY 2

Log 209 Gable - 5000mm

AI-0634LOG209G-V4

QTY 2

Starter Board - 66x34x5000mm QTY 2

LB34RT66-A-5000

Log Board - 120x34x1715mm QTY 12

LB34-B-1715

Log Board - 120x34x482mm QTY 24

LB34-B-482

Log Board - 120x34x482mm QTY 24

LB34-C-482

Log Board - 120x34x5000mm QTY 55

LB34-A-5000

Log Board - 120x34x5500mm QTY 2

LB34-AE-5500 

Floor Board - 121x16x2369mm QTY 84

MB16-2369

Roof Board - 121x16x2629mm QTY 108

MB16-2629

Bearer - 44x58x2286mm QTY 36

F4458-2286-PT

Bearer - 44x58x2402mm QTY 8

F4458-2402

Purlin - 45x120x6004mm QTY 5

F45120-AE-6004

Fascia - 16x120x2649mm QTY 4

S16120-2649

Eaves Frame - 27x44x2001mm QTY 6

F2744-2001

10

Log Board - 120x34x6000mm QTY 2

LB34-AE-6000

Fascia - 16x120x2001mm QTY 6

S16120-2001

Log Board - 120x34x5000mm 

LB34-AD-5000

*All components for the Windows and Doors are shown 

in the Windows and Doors instruction packs.

Roof Spacers QTY 5

PI-07-0208 (20x100x2mm)

23

22

Storm Brace - 27x44x2000mm QTY 8

F2744-2000

21

11

20

Closure Trim - 16x28x2400mm (approx length) QTY 18

S1628-2400

Содержание 0634LOG209-V4

Страница 1: ...ring excessive dry spells due to an interior moisture loss Unfortunately these processes cannot be avoided but can be helped It is suggested that the outdoor building is sprayed with water during exte...

Страница 2: ...oard 120x34x5000mm QTY 55 LB34 A 5000 Log Board 120x34x5500mm QTY 2 LB34 AE 5500 Floor Board 121x16x2369mm QTY 84 MB16 2369 Roof Board 121x16x2629mm QTY 108 MB16 2629 Bearer 44x58x2286mm QTY 36 F4458...

Страница 3: ...locks at either end in a staggered pattern Before securing ensure that the boards are fitted properly in their respective tongues and grooves Nail Bag 40mm Screw x1356 30mm Screw x 108 P 3 Please reta...

Страница 4: ...r end of each board are flush and level with the ends of the frame Fix each of the starter boards to the frame by screwing through the notch into the frame as shown in the illustration 4x70mm Screws P...

Страница 5: ...oards No s 5 8 onto the starter boards to create your first level Ensure that the boards are level and flush with each other as you lay each one Step 4 See Pre Assembly Parts needed No 6 QTY 12 No 7 Q...

Страница 6: ...nce IMPORTANT Pre drill before fixing screws Step 5 See Window Assembly Parts needed No 1 QTY 2 Refer to window assembly instructions to assemble windows Step 6 Parts needed No 1 QTY 2 Ensure that the...

Страница 7: ...2 No 11 QTY 1 Following the same method outlined in Pre Assembly lay the last two boards No s 8 11 onto the front of the assembly Once in position place the last 2 log board s No 10 onto the plain sid...

Страница 8: ...ng a staight edge and a pencil mark out a line as a guide Cut along the pencil mark and remove the excess Place the cut down board s back onto the roof and secure into place using 4x40mm screws per bo...

Страница 9: ...flush to the log board on one side Continue adding the floor boards internally making sure to interlock each individual board Do NOT secure the boards until the last board has been measured and cut Fo...

Страница 10: ...al space 20 20 Pre drill hole 30mm screw trim to fit Step 14 Parts needed No 20 QTY 9 Inside the building place the closure trim No 20 against the boarding and align with the roof as shown in the illu...

Страница 11: ...t immediately after the building has been assembled 18 18 Pre drill hole 80mm bolt Step 18 Parts needed No 21 QTY 8 Arrange the storm braces No 21 around the building internally Place 2x storm braces...

Отзывы: