P 7
Please retain product label and instructions for future reference
Step 7
(See Pre-Assembly)
Parts needed - No. 6 QTY 14
No. 7 QTY 12
No. 8 QTY 12
No. 9 QTY 2
Following the same method
outlined in
Pre-Assembly
, lay
the remaining boards (No’s. 6,
7, 8, & 9) onto the assembly
to bring the board level to the
top of the window and door
frames.
*Ensure that the boards are
level and flush with each
other as you lay each one.
*Doors can be hung once the
boarding has enclosed the
door frame.
Step 8
(See Pre-Assembly)
Parts needed - No. 8 QTY 1
No. 10 QTY 2
No. 11 QTY 1
Following the same method
outlined in
Pre-Assembly
, lay
the last two boards (No’s. 8 &
11) onto the front of the
assembly. Once in position
place the last 2 log board’s
(No. 10) onto the plain sides.
*Ensure that the boards are
level and flush with each
other as you lay each one.
8
11
3
3
IMPORTANT: Pre-drill before fixing screws.
Step 9
(See Pre-Assembly)
Parts needed - No. 3 QTY 2
Place the gable tops (No. 3)
onto the assembly. Fix into
position by screwing
through the notches as
shown in the illustration.
*Ensure that the boards are
level and flush with each
other as you lay each one.
4x70mm Screws
Pre drill
hole
70mm
screw
IMPORTANT: Pre-drill before fixing screws.
8
6
6
8
8
7
7
9
9
10
10
IMPORTANT: Pre-drill before fixing screws.