
a
a
b
c
c
P 7
Please retain product label and instructions for future reference
Step 8
Parts needed - No. 37 QTY 18
Fix the Veranda Boards
(No. 37)
to the floor bearers using
7x30mm screws per board.
Some boards need to be
notched to fit. Cut a
notch 98x28mm on one
corner.
Fix the remaining boards
17mm apart.
The final board will need
to be shortened by
28mm.
126x30mm Screws
Step 7
(See Pre-Assembly)
Parts needed - No. 11 QTY 6
No. 13 QTY 6
No. 17 QTY 12
No. 18 QTY 12
No. 19 QTY 12
No. 22 QTY 6
Following the same method
outlined in
Pre-Assembly
, lay
the remaining boards
(No’s. 11,
13, 17, 18, 19 & 22)
onto the
assembly to bring the board
level to the top of the window
and door frames.
*Ensure that the boards are
level and flush with each
other as you lay each one.
**Doors can be hung once the
boarding has enclosed the
door frame.
IMPORTANT:
Pre-drill before fixing screws.
17
22
11
19
13
19
18
18
17
37
37
37
*
Cut to fit
Pre drill
hole
30mm
screw
b