background image

It is ESSENTIAL that you apply wood 

treatment immediately after the building 

has been assembled.

IMPORTANT: 

Pre-drill before fixing screws.

P 16

Please retain product label and instructions for future reference

             

42

42

Step 29

Parts needed - No. 42 QTY 2

 

 

   No. 43 QTY 3

Attach the first fascia (

No’s. 42

) to 

one side on the back of the 

building, ensuring to trap the felt 

between the fascia and the 

building. 

Secure the fascia into position 

using 4x40mm screws, making 

sure to fix through the fascia into 

the roof purlin, fascia block 

and/or log boards. 

Once in place, mark the excess 

fascia with a pencil and then trim 

the fascias to follow the shape of 

building as shown in the 

illustration. Repeat this on the 

other back side of the building.

Attach the next size fascia board 

(No. 43) 

to the sides of the 

building in the same way.

For the final fascia above the 

door, you will need to measure 

and cut the remaining No.43 

fascia.

Pre drill 

hole

40mm 

screw

43

43

Step 30

Parts needed - No. 44 QTY 8 

Arrange the storm braces (

No. 44

)

around the building (

internally

). 

Place 2x storm braces per side 

fixing into place using 2x 70mm 

bolts per brace making sure the 

washer & nut are tightened from 

the outside of the building.

*Ensure the storm braces are

secured at the highest point

possible on each side.

**Storm braces will help your

building expand and contract

properly.

***It is important that each

bolt is tightened using a 

washer so as not to damage 

the log boards.

16x70mm Bolt Sets

Pre drill 

hole

70mm 

bolt

43

43

44

44

Содержание 0628LOG127-V5

Страница 1: ...nshine and sheltered as much as possible during rain or snow BUILDING A BASE When thinking about where the building and base are going to be constructed Ensure that there will be access 60cm to all si...

Страница 2: ...QTY 1 LB28 J 2028 1x45 deg cut left 50mm bottom notch Log Board 28x120x2028mm QTY 1 LB28 JD 2028 1x45 deg cut left 50mm bottom notch window notch Log Board 28x120x2028mm QTY 1 LB28 ADGL 2028 1x45 deg...

Страница 3: ...x44x1361mm QTY 1 F4444 H 1361 PT 2x45 deg cut 1361mm finished Bearer 44x44x1820mm QTY 1 F4444 G 1820 PT 1x45 deg cut 1820mm finished Bearer 44x44x1864mm QTY 1 F4444 G 1864 PT 1x45 deg cut 1864mm finis...

Страница 4: ...I 0628LOG127 V3FBP MB16 C 2748 QTY 15 MB16 P 2748 QTY 1 MB16 P 2734 QTY 1 MB16 P 2622 QTY 1 MB16 P 2510 QTY 1 MB16 P 2398 QTY 1 MB16 P 2286 QTY 1 MB16 P 2174 QTY 1 MB16 P 2062 QTY 1 MB16 P 1950 QTY 1...

Страница 5: ...r using 10x70mm screws ensuring the frame is flush 10x70mm Screws Pre drill hole 70mm screw Step 2 Parts needed No 35 QTY 7 No 36 QTY 1 No 37 QTY 1 No 38 QTY 1 Arrange the remaining framing No 35 36 3...

Страница 6: ...Screws 70mm screw Step 4 See Pre Assembly Parts needed No 6 QTY 1 Make the assembly level by adding another board No 6 as shown in the diagram Fix using 1x70mm screw Ensure to stagger the screws so a...

Страница 7: ...has enclosed the door frame Step 6 See Pre Assembly Parts needed No 4 QTY 6 No 5 QTY 6 No 10 QTY 12 No 11 QTY 6 No 12 QTY 6 No 22 QTY 12 Following the same method outlined in Pre Assembly lay the next...

Страница 8: ...o as not to collide with the previous screw Step 13 Parts needed No 19 QTY 1 No 20 QTY 1 Lay the last two boards No 19 20 onto the front of the assembly Fix into position with 2x70mm screws per board...

Страница 9: ...the same way Screw down through the purlin at an angle as shown in the diagram using 1x70mm screws 3x70mm Screws Pre drill hole 70mm screw Step 15 Parts needed No 33 QTY 2 Place and fix the remaining...

Страница 10: ...nst the wall of the building 6x90mm Screws Pre drill hole 90mm screw Step 18 You can now fix the assembled roof truss to the building making sure the attached blocks sit inside the assembly Some adjus...

Страница 11: ...x through the roof board into the truss below 20x40mm Screws used at this stage Step 20 Parts needed No 50 QTY 6 No 51 QTY 6 No 52 QTY 3 Start arranging the roof board packs A B C onto the roof assemb...

Страница 12: ...through the roof board into the truss below as shown in Step 19 Repeat this so you have 7 boards high screwed down in total on each of the 5 sides Step 22 Parts needed No 50 QTY 6 No 51 QTY 6 No 52 Q...

Страница 13: ...trative purposes only and may differ from your floor 49 50 50 Pre drill hole 40mm screw Step 23 Parts needed No 50 QTY 10 No 51 QTY 10 No 53 QTY 4 Continue arranging the roof board packs A B C onto th...

Страница 14: ...oof as shown in the illustration Once in position fix each trim into place by pre drilling a pilot hole and using 6x30mm screws per trim equally spacing them along the face of the board 42x30mm Screws...

Страница 15: ...nd lay onto the roof in the order shown in the illustration Secure along the outer edge of each felt section using felt tacks spaced out at approximately 100mm intervals Ensure there is 50mm of overha...

Страница 16: ...ding as shown in the illustration Repeat this on the other back side of the building Attach the next size fascia board No 43 to the sides of the building in the same way For the final fascia above the...

Отзывы: