IMPORTANT:
Pre-drill before fixing screws.
IMPORTANT:
Pre-drill before fixing screws.
P 12
Please retain product label and instructions for future reference
Pre drill
hole
40mm
screw
50
51
50
51
52
50
50
Step 21
Parts needed - No. 50 QTY 6
No. 51 QTY 6
No. 52 QTY 3
Continue arranging the roof
board packs
(A, B, & C)
onto the
roof assembly, working around
the structure, building each
layer of roof boards one by one.
*
HINT:
keep the roof board
packs seperate so as not to
mix up the positions.
Once you are happy with the fit
of the roof boards, fix the 5th,
6th & 7th boards into place
using 4 screws per board (2
each side of the board) ensur-
ing the screws fix through the
roof board into the truss below
as shown in Step 19.
Repeat this so you have 7
boards high screwed down in
total on each of the 5 sides.
Step 22
Parts needed - No. 50 QTY 6
No. 51 QTY 6
No. 52 QTY 3
Continue arranging the roof
board packs
(A, B & C)
onto the
roof assembly, working around
the structure, building each layer
of roof boards one by one.
*
HINT:
keep the roof board
packs seperate so as not to
mix up the positions.
Once you are happy with the fit
of the roof boards, fix the 8th,
9th & 10th boards into place
using 4 screws per board (2 each
side of the board) ensuring the
screws fix through the roof
board into the truss below as
shown in Step 19.
Repeat this so you have 10
boards high screwed down
in total on each of the 5 sides.
Pre drill
hole
40mm
screw
51
51
52
60x40mm Screws used at this stage
20x40mm Screws used at this stage