![Mercia Garden Products 0628LOG127-V5 Скачать руководство пользователя страница 14](http://html1.mh-extra.com/html/mercia-garden-products/0628log127-v5/0628log127-v5_general-instructions-manual_1772573014.webp)
IMPORTANT:
Pre-drill before fixing screws.
IMPORTANT:
Pre-drill before fixing screws.
P 14
Please retain product label and instructions for future reference
*Internal view
Roof
Closure Trim
Internal
45
*Measure and cut the
closure trims to
fit the internal space.
Pre drill
hole
30mm
screw
*trim to fit
Step 25
Parts needed - No. 45 QTY 7
Inside the building place the closure
trim (
No. 45
) against the boarding
and align with the roof as shown in
the illustration.
Once in position fix each trim
into place by pre drilling a pilot hole
and using 6x30mm screws per trim,
equally spacing them along the face
of the board.
42x30mm Screws
45
45
30mm
screw
Pre drill
hole
*Cut to fit
Step 26
Parts needed - No. 45 QTY 7
Once the floor has been laid arrange the
closure trim (
No. 45
) around the outside
edge of floor (
internally
), measure and cut
down accordingly to best match the
internal space.
Secure each trim section into place using
6x30mm spaced equally along the board
as shown in the illustration.
*Do NOT fix the closure trim to the floor
boards.
42x30mm Screws