Front roof boards

Front view 

Please retain product label and instructions for future reference

             

23b

18

18

Pre drill 

hole

70mm 

screw

12

12

12

a

b

Step 11

Parts needed - No. 12 QTY 3

 

Align the Roof Purlin(

s

) (

No. 

12

) into the cut out slots on each 

gable top ensuring each  Roof Purlin 

interlocks the boards.

 

Secure the Roof Purlin at 

each end by screwing through the 

bars into the boards (

ensure to 

pre-drill to avoid the boards 

splitting

) using 4x70mm screws per 

Roof Purlin.

*Please note:

 The gable shown is for 

illustrative purposes and may differ 

in width from your choice in 

product. 

Nevertheless, despite any 

differences 

the process of fixing the 

Roof Purlins

 

is the same.

12x70mm Screws

a

b

IMPORTANT: 

Pre-drill before fixing screws.

40mm 

screw

Pre drill 

hole

*

Cut to fit

Step 12

Parts needed - No. 18 QTY 56

 

Place the first two roof 

board’s (

No. 18

) onto the assembly 

on each side, making sure the 

boards are flush to the end of the 

roof purlin. Once in position fix to 

each purlin using 3x40mm screws.

Due to natural occurences of wood 

shrinkage / expansion. You maybe 

required to use the provided spac-

ers and place a space of 2mm to 

ensure every roof board lines up 

with the truss’.

*Ensure the roof boards meet at the 

top of the apex and leave an over-

hang at the bottom.

Continue adding the roof boards

along the roof, fixing each one into

position using 3x40mm screws,

making sure that each board is 

interlocked, flush at the bottom &

meet at the top of the apex.

 

The last board on each side 

will overhang: Using a straight edge

and a pencil mark out a line as 

a guide. 

Cut along the pencil mark and

remove the excess. Place the cut 

down board’s back onto the roof 

and secure into place using 

3x40mm screws per board.

*Please Note: 

This image is for 

illustrative purposes and may 

differ from your choice in product. 

Nevertheless the process of 

cutting and fitting the last roof 

board(s) is the same.

168x40mm Screws 

a

b

a

b

Содержание 0619LOG003-V4

Страница 1: ...ain or snow BUILDING A BASE When thinking about where the building and base are going to be constructed Ensure that there will be access 60cm to all sides for maintenance work and annual treatment Ens...

Страница 2: ...16 C 2760 Roof Board 121x16x1752mm QTY 56 MB16 C 1752 2 1 Short Window Pack QTY 2 Double Door Pack Closure Trim 16x28x2400mm approx length QTY 14 S1628 2400 P 2 0619LOG003 V4 Overall Dimensions Width...

Страница 3: ...assembly Please note Each board interlocks at either end in a staggered pattern Before securing ensure that the boards are fitted properly in their respective tongues and grooves P 3 Please retain pro...

Страница 4: ...ange the remaining framing No 14 inside the assembled frame Ensure there is an equal amount of space between each frame Secure each of the frames in place using 2x70mm screws for each side of the bear...

Страница 5: ...ition Nevertheless the process of fitting the door frame is the same Please Note The short boards at the front of the building either side of the door and window opening s can be placed either side de...

Страница 6: ...of the window and door frames Ensure that the boards are level and flush with each other as you lay each one Doors can be hung once the boarding has enclosed the door frame 9 20 21 24 3 3 Step 9 Part...

Страница 7: ...sembly on each side making sure the boards are flush to the end of the roof purlin Once in position fix to each purlin using 3x40mm screws Due to natural occurences of wood shrinkage expansion You may...

Страница 8: ...QTY 27 Place the first floor board No 17 inside the building flush to the log board on one side Continue adding the floor boards internally making sure to interlock each individual board Following th...

Страница 9: ...per trim equally spacing them along the face of the board 42x30mm Screws 30mm screw Pre drill hole Cut to fit Step 16 Parts needed No 11 QTY 7 Once the floor has been laid arrange the closure trim No...

Страница 10: ...the apex 12x40mm Screws Pre drill hole 40mm screw Pre drill hole 60mm bolt Step 19 Parts needed No 19 QTY 8 Arrange the storm braces No 19 around the building internally Place 2x storm braces per side...