Mercia Garden Products 0619LOG003-V4 Скачать руководство пользователя страница 4

P 4

For assistance please contact customer care on: 01636 821215

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

www.merciagardenproducts.co.uk

Please retain product label and instructions for future reference

             

13

14

13

14

13

13

13

13

13

13

13

13

IMPORTANT: 

Pre-drill before fixing screws.

Pre drill 

hole

70mm 

screw

a

Step 1

Parts Needed - No. 13 QTY 10

                                 No. 14 QTY 2

 

Lay the bearers (

No’s. 13 & 

14

) onto a firm and level surface 

(

free from areas where standing 

water can collect

) as shown in the 

illustration.

Fix the framing together at each 

corner screwing 2 screws per 

corner using 8x70mm screws, 

ensuring the frame is flush.

8x70mm Screws 

Pre drill 

hole

70mm 

screw

b

 

Following the same 

method arrange the 

remaining framing (

No. 14

inside the assembled frame.

*Ensure there is an equal

amount of space between 

each frame.

Secure each of the frames in 

place using 2x70mm screws 

for each side of the bearer, 

ensuring the framing remains 

level.

44x70mm Screws 

13

14

13

5

5

4

4

4

Pre drill 

hole

70mm 

screw

Step 2

Parts Needed - No. 4 QTY 2

                                 No. 5 QTY 2

Place the starter boards (

No’s. 4 

& 5

) on to assembled base frame 

along the longest sides.

*Ensure the notches at either 

end of each board are flush 

and level with the ends of the 

frame.

Fix each of the starter boards to

the frame by screwing through

the notch into the frame as shown 

in the illustration.

4x70mm Screws 

IMPORTANT: 

Pre-drill before fixing screws.

a

b

Example picture

2 screws per bearer per end

13

Содержание 0619LOG003-V4

Страница 1: ...ain or snow BUILDING A BASE When thinking about where the building and base are going to be constructed Ensure that there will be access 60cm to all sides for maintenance work and annual treatment Ens...

Страница 2: ...16 C 2760 Roof Board 121x16x1752mm QTY 56 MB16 C 1752 2 1 Short Window Pack QTY 2 Double Door Pack Closure Trim 16x28x2400mm approx length QTY 14 S1628 2400 P 2 0619LOG003 V4 Overall Dimensions Width...

Страница 3: ...assembly Please note Each board interlocks at either end in a staggered pattern Before securing ensure that the boards are fitted properly in their respective tongues and grooves P 3 Please retain pro...

Страница 4: ...ange the remaining framing No 14 inside the assembled frame Ensure there is an equal amount of space between each frame Secure each of the frames in place using 2x70mm screws for each side of the bear...

Страница 5: ...ition Nevertheless the process of fitting the door frame is the same Please Note The short boards at the front of the building either side of the door and window opening s can be placed either side de...

Страница 6: ...of the window and door frames Ensure that the boards are level and flush with each other as you lay each one Doors can be hung once the boarding has enclosed the door frame 9 20 21 24 3 3 Step 9 Part...

Страница 7: ...sembly on each side making sure the boards are flush to the end of the roof purlin Once in position fix to each purlin using 3x40mm screws Due to natural occurences of wood shrinkage expansion You may...

Страница 8: ...QTY 27 Place the first floor board No 17 inside the building flush to the log board on one side Continue adding the floor boards internally making sure to interlock each individual board Following th...

Страница 9: ...per trim equally spacing them along the face of the board 42x30mm Screws 30mm screw Pre drill hole Cut to fit Step 16 Parts needed No 11 QTY 7 Once the floor has been laid arrange the closure trim No...

Страница 10: ...the apex 12x40mm Screws Pre drill hole 40mm screw Pre drill hole 60mm bolt Step 19 Parts needed No 19 QTY 8 Arrange the storm braces No 19 around the building internally Place 2x storm braces per side...

Отзывы: