background image

P 6

Please retain product label and instructions for future reference

             

10

10

9

5

7

7

8

Step 7

Once you have laid the second

level of boards onto the assembly

slide the window(

s

) (

No. 1

between the smaller boards and 

rest on to the longer board.

*Ensure the boards are level with

each end.

*Please note:

 This image is for

illustrative purposes and may

differ from your choice in product

(

regarding window position

).

Nevertheless the process of fitting

the window is the same.

Step 8

Parts Needed - No. 5 QTY 6

                                 No. 7 QTY 11

                                 No. 8 QTY 5

                                 No. 9 QTY 5

                                 No. 10 QTY 12

Following the same method

outlined in 

Pre-Assembly

, lay

the remaining boards (

No’s. 5, 7, 

8, 9 & 10

) onto the assembly

to bring the board level to the 

top of the window and door 

frames.

*Ensure that the boards are

level and flush with each

other as you lay each one.

*Doors can be hung once the 

boarding has enclosed the 

door frame. 

 

9

20

21

24

3

3

Step 9

Parts Needed - No. 9 QTY 1

                                 No. 24 QTY 1

                                 No. 20 QTY 1

                                 No. 21 QTY 1

                                 

Following the same method

outlined in 

Pre-Assembly

, lay

the last two boards (

No’s. 9

& 20

)

 

onto the front and rear 

of the assembly.

Once in position place log

boards (

No’s. 24 & 21

) onto 

the window and plain side.

*Ensure that the boards are

level and flush with each

other as you lay each one.

 

Step 10

Parts Needed - No. 3 QTY 2

Place the gable (

No. 3

onto the assembly. Fix into 

position by screwing through 

the notches as shown in the 

illustration. 

*Ensure that the boards are

level and flush with each

other as you lay each one.

4x70mm Screws 

Pre drill 

hole

70mm 

screw

Tip: Ensure the lip on the window frame is located on the inside of the building

Содержание 0619LOG003-V4

Страница 1: ...ain or snow BUILDING A BASE When thinking about where the building and base are going to be constructed Ensure that there will be access 60cm to all sides for maintenance work and annual treatment Ens...

Страница 2: ...16 C 2760 Roof Board 121x16x1752mm QTY 56 MB16 C 1752 2 1 Short Window Pack QTY 2 Double Door Pack Closure Trim 16x28x2400mm approx length QTY 14 S1628 2400 P 2 0619LOG003 V4 Overall Dimensions Width...

Страница 3: ...assembly Please note Each board interlocks at either end in a staggered pattern Before securing ensure that the boards are fitted properly in their respective tongues and grooves P 3 Please retain pro...

Страница 4: ...ange the remaining framing No 14 inside the assembled frame Ensure there is an equal amount of space between each frame Secure each of the frames in place using 2x70mm screws for each side of the bear...

Страница 5: ...ition Nevertheless the process of fitting the door frame is the same Please Note The short boards at the front of the building either side of the door and window opening s can be placed either side de...

Страница 6: ...of the window and door frames Ensure that the boards are level and flush with each other as you lay each one Doors can be hung once the boarding has enclosed the door frame 9 20 21 24 3 3 Step 9 Part...

Страница 7: ...sembly on each side making sure the boards are flush to the end of the roof purlin Once in position fix to each purlin using 3x40mm screws Due to natural occurences of wood shrinkage expansion You may...

Страница 8: ...QTY 27 Place the first floor board No 17 inside the building flush to the log board on one side Continue adding the floor boards internally making sure to interlock each individual board Following th...

Страница 9: ...per trim equally spacing them along the face of the board 42x30mm Screws 30mm screw Pre drill hole Cut to fit Step 16 Parts needed No 11 QTY 7 Once the floor has been laid arrange the closure trim No...

Страница 10: ...the apex 12x40mm Screws Pre drill hole 40mm screw Pre drill hole 60mm bolt Step 19 Parts needed No 19 QTY 8 Arrange the storm braces No 19 around the building internally Place 2x storm braces per side...

Отзывы: