Mercia Garden Products 05DTOVPN0365DD-V1 Скачать руководство пользователя страница 7

P 7

             

Please retain product label and instructions for future reference

             

14

14

14

Pre drill 

hole

30mm 

screw

Fix the cover trims 

(No.14)

 to the 

back corners of the building and 

across the joint at the back, securing 

each trim into place with 3x30mm 

screws 

9x30mm Screws     

Step 15

Parts Needed -

 

No. 14 QTY 2

                                 

IMPORTANT: 

Pre-drill before fixing screws.

15

15

15

15

    

Pre drill 

hole

30mm 

screw

Fix the fascias 

(No.15) 

around the  

top of the building, make sure to trap 

the felt inbetween. Secure each trim 

in place with 3x30mm screws.

12x30mm Screws  

Step 16

Parts Needed -

 

No. 15 QTY 4                                 

IMPORTANT: 

Pre-drill before fixing screws.

Screw the Staple 

(No.21) 

to the left 

Door,  Make sure the Hasp 

(No.21)

 is in 

line with the staple and screw into the 

right Door.

9x30mm Screws

Pre drill 

hole

30mm 

screw

Step 17

Parts Needed - No. 21 QTY 1

                                 

IMPORTANT: 

Pre-drill before fixing screws.

21

b

It is ESSENTIAL that you apply wood 

treatment immediately after the building 

has been assembled.

Содержание 05DTOVPN0365DD-V1

Страница 1: ...ing your garden building underneath large trees to prevent the tree causing damage to the building TIMBER As with all natural materials timber can be affected during various weather conditions For the...

Страница 2: ...45 1178MM 13 Door Side Cover Trim 28x12x1178mm QTY 1 S1228 1178MM 14 15 Back Cover Trim 45x7x1094mm QTY 3 S745 1094MM Floor QTY 2 AI R11OSBF950X920 V1 5 Door QTY 2 AI R11FBOVFLD525X1110 V1 6 Roof QTY...

Страница 3: ...from areas where standing water can collect 3x50mm Screws IMPORTANT Pre drill before fixing screws a Step 2 Parts Needed No 4 QTY 2 No 2 QTY 1 IMPORTANT Pre drill before fixing screws 2 4 4 a Pre dril...

Страница 4: ...ned at either side of the build ing depending on your needs and preferences 3x50mm Screws Step 5 Parts Needed No 10 QTY 1 IMPORTANT Pre drill before fixing screws Step 6 Parts Needed No 9 QTY 1 No 18...

Страница 5: ...Screws Pre drill hole 30mm screw Step 9 Parts Needed No 6 QTY 2 No 17 QTY 4 IMPORTANT Pre drill before fixing screws 6 6 17 17 17 17 17 Step 10 IMPORTANT Pre drill before fixing screws Align each door...

Страница 6: ...19 Pre drill hole 30mm screw 16 Parts Needed No 16 QTY 2 No 19 QTY 2 Line up the door block No 16 at the top and bottom of the secondary door Fix with 2 x30mm screws through the outside of the door in...

Страница 7: ...screw Fix the fascias No 15 around the top of the building make sure to trap the felt inbetween Secure each trim in place with 3x30mm screws 12x30mm Screws Step 16 Parts Needed No 15 QTY 4 IMPORTANT...

Страница 8: ...P 8 2 1 3 4...

Страница 9: ...P 9 1 2...

Отзывы: