
P 7
Please retain product label and instructions for future reference
14
14
14
Pre drill
hole
30mm
screw
Fix the cover trims
(No.14)
to the
back corners of the building and
across the joint at the back, securing
each trim into place with 3x30mm
screws
9x30mm Screws
Step 15
Parts Needed -
No. 14 QTY 2
IMPORTANT:
Pre-drill before fixing screws.
15
15
15
15
Pre drill
hole
30mm
screw
Fix the fascias
(No.15)
around the
top of the building, make sure to trap
the felt inbetween. Secure each trim
in place with 3x30mm screws.
12x30mm Screws
Step 16
Parts Needed -
No. 15 QTY 4
IMPORTANT:
Pre-drill before fixing screws.
Screw the Staple
(No.21)
to the left
Door, Make sure the Hasp
(No.21)
is in
line with the staple and screw into the
right Door.
9x30mm Screws
Pre drill
hole
30mm
screw
Step 17
Parts Needed - No. 21 QTY 1
IMPORTANT:
Pre-drill before fixing screws.
21
b
It is ESSENTIAL that you apply wood
treatment immediately after the building
has been assembled.
Содержание 05DTOVPN0365DD-V1
Страница 8: ...P 8 2 1 3 4...
Страница 9: ...P 9 1 2...