Mercia Garden Products 05DTOVPN0365DD-V1 Скачать руководство пользователя страница 3

P 3

Please retain product label and instructions for future reference

             

Pre Assembly

Before assembling remove the transportation

blocks from the bottom of each panel.

Take care removing the blocks as to not damage

the panels. Tap with a flat headed screwdriver 

and hammer.

Dispose of the blocks once removed.

Step 1

Parts Needed -

 

No. 5 QTY 2

                                 

5

5

Pre drill 

hole

50mm 

screw

Place the two floors 

(No.5)

 onto a firm and 

level base upside down.

Secure the floors 

(No.5) 

together using 

3x50mm screws, fixing in an alternating 

pattern as shown in the illustration.

Once fitted, turn the floor assembly the 

right way up.

Ensure the base has suitable drainage & is 

free from areas where standing water can  

collect.

3x50mm Screws

 

IMPORTANT: 

Pre-drill before fixing screws.

a

Step 2

Parts Needed -

 

No. 4 QTY 2

 

 

 - No. 2 QTY 1

                                 

IMPORTANT: 

Pre-drill before fixing screws.

2

4

4

a

Pre drill 

hole

50mm 

screw

Place the back panels 

(No.4)

 and 

the right gable 

(No.2)

 onto the 

floor and  secure in place using 

6x50mm screws.

Do 

not

 secure to the floor until the 

roof is fixed.

6x50mm Screws

Step 3

Parts Needed -

 

No. 1 QTY 1

 

 

 - No. 3 QTY 1

                                 

IMPORTANT: 

Pre-drill before fixing screws.

a

a

Pre drill 

hole

50mm 

screw

a

a

a

a

a

3

1

Following the same method

outlined in step 2, place the front 

panel 

(No.1)

 and the left gable 

(No.3) 

onto the floor and secure in 

place using 6x50mm screws.

*The door opening can be posi-

tioned at either side of the build-

ing depending on your needs and 

preferences.

Do 

not

 secure to the floor until the 

roof is fixed.

6x50mm Screws

a

Содержание 05DTOVPN0365DD-V1

Страница 1: ...ing your garden building underneath large trees to prevent the tree causing damage to the building TIMBER As with all natural materials timber can be affected during various weather conditions For the...

Страница 2: ...45 1178MM 13 Door Side Cover Trim 28x12x1178mm QTY 1 S1228 1178MM 14 15 Back Cover Trim 45x7x1094mm QTY 3 S745 1094MM Floor QTY 2 AI R11OSBF950X920 V1 5 Door QTY 2 AI R11FBOVFLD525X1110 V1 6 Roof QTY...

Страница 3: ...from areas where standing water can collect 3x50mm Screws IMPORTANT Pre drill before fixing screws a Step 2 Parts Needed No 4 QTY 2 No 2 QTY 1 IMPORTANT Pre drill before fixing screws 2 4 4 a Pre dril...

Страница 4: ...ned at either side of the build ing depending on your needs and preferences 3x50mm Screws Step 5 Parts Needed No 10 QTY 1 IMPORTANT Pre drill before fixing screws Step 6 Parts Needed No 9 QTY 1 No 18...

Страница 5: ...Screws Pre drill hole 30mm screw Step 9 Parts Needed No 6 QTY 2 No 17 QTY 4 IMPORTANT Pre drill before fixing screws 6 6 17 17 17 17 17 Step 10 IMPORTANT Pre drill before fixing screws Align each door...

Страница 6: ...19 Pre drill hole 30mm screw 16 Parts Needed No 16 QTY 2 No 19 QTY 2 Line up the door block No 16 at the top and bottom of the secondary door Fix with 2 x30mm screws through the outside of the door in...

Страница 7: ...screw Fix the fascias No 15 around the top of the building make sure to trap the felt inbetween Secure each trim in place with 3x30mm screws 12x30mm Screws Step 16 Parts Needed No 15 QTY 4 IMPORTANT...

Страница 8: ...P 8 2 1 3 4...

Страница 9: ...P 9 1 2...

Отзывы: